Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Diagram showing MRP system inputs flowing through the MRP engine to produce outputs
MRP

MRP Inputs and Outputs: The Complete Breakdown for Manufacturers

Master the three inputs and key outputs of MRP systems. Learn how the master production schedule, BOM, and inventory records drive planned orders, purchase requisitions, and exception reports.

April 16, 202610 min read
Warehouse shelves with different batch quantities illustrating lot sizing methods in manufacturing
MRP

MRP Lot Sizing Methods: LFL, EOQ, POQ & More Compared

Compare MRP lot sizing methods including Lot-for-Lot, EOQ, Fixed Order Quantity, and Period Order Quantity. Learn when to use each method with formulas, examples, and cost analysis.

April 16, 202610 min read
Manufacturing planner reviewing excessive MRP change notifications on computer screen
MRP

MRP Nervousness: Causes, Effects & How to Stabilize Your Plans

Understand MRP nervousness, why MRP systems generate excessive schedule changes, and proven techniques like time fences, firm planned orders, and dampening to stabilize material plans.

April 16, 20269 min read
MRP planning grid showing gross requirements, scheduled receipts, on-hand balance, and planned orders
MRP

MRP Formula: Gross-to-Net Requirements (with a Worked Example)

The MRP formula: net requirement = gross requirement - projected on hand - scheduled receipts + safety stock. Step-by-step gross-to-net worked example.

April 16, 202611 min read
Split image showing MRP push-based and JIT pull-based manufacturing approaches side by side
MRP

MRP vs JIT: Which Material Planning Strategy Fits Your Factory?

Compare MRP and JIT (Just-in-Time) manufacturing approaches. Learn the key differences, when to use each, and how to combine MRP and JIT for optimal production planning.

April 16, 20269 min read
Side-by-side comparison diagram of MRP, MRP II, and ERP system capabilities
MRP

MRP vs ERP (and MRP II): Key Differences, Comparison Table and Worked Example

MRP vs ERP explained: MRP plans materials, ERP runs the whole business, and MRP II sits between them. A comparison table of MRP, MRP II, ERP and APS, one worked example, and how to choose.

April 16, 202614 min read
Split screen showing complex Excel spreadsheet versus clean MRP software dashboard
MRP

MRP vs Spreadsheets: When to Upgrade from Excel to MRP Software

Compare MRP software against spreadsheet-based planning. Learn the signs you have outgrown Excel, what MRP automates, and how to make the transition with minimum disruption.

April 16, 20269 min read
Multi-level product structure tree diagram showing parent-child component relationships
MRP

Multi-Level BOM in MRP: Structure, Explosion & Low-Level Codes

Master multi-level bills of materials in MRP. Learn BOM explosion, low-level coding, parent-child relationships, and how MRP processes complex product structures across multiple assembly levels.

April 16, 202610 min read
Warehouse inventory with highlighted safety stock buffer level on shelving units
MRP

Safety Stock in MRP: Formulas, Calculations & Best Practices

Learn how to calculate and manage safety stock in MRP systems. Covers formulas for safety stock calculation, service level targeting, demand variability, and lead time uncertainty.

April 16, 202610 min read
Manufacturing warehouse with organized inventory shelves illustrating material requirements planning
MRP

What Is MRP? Material Requirements Planning With an Example

MRP (material requirements planning) turns a master production schedule into dated purchase and work orders. Inputs, outputs, a worked gross-to-net table.

April 16, 202611 min read
Side by side comparison of manual whiteboard scheduling and automated software scheduling on a computer screen
Production Scheduling

Automated vs Manual Production Scheduling: A Comparison

Compare automated and manual production scheduling approaches. Learn when each works best, how to combine them, and what automation means for manufacturing schedulers.

April 14, 20269 min read
Split image showing batch processing equipment on one side and discrete manufacturing assembly line on the other
Production Scheduling

Batch Scheduling vs Discrete Scheduling: When to Use Each

Understand the differences between batch scheduling and discrete scheduling in manufacturing, when each approach applies, and how to handle mixed environments.

April 14, 20269 min read
Let's Solve Your Challenges Together