Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
Featured Guides
EDGEBIC ERP Integration: The Complete Guide
How EDGEBIC integrates with any ERP: eight import masks, three source options, a documented data mapping, and the weekly rhythm that keeps a finite capacity schedule current.
The EDGEBIC Scheduling Glossary Index
A themed index to the EDGEBIC glossary: scheduling engine, capacity and calendars, materials and planning, shop floor, reporting, quoting, and data import terms, defined in plain language.
Migrating to EDGEBIC: The Complete Guide
The full path from RMDB, EDGEBI, a spreadsheet, or a whiteboard to EDGEBIC: what carries forward, what is hand-built, the import order, and how to validate the first schedule.
Deploying and Administering EDGEBIC: From First Install to Multi-User
Manufacturing scheduling software deployment done right: EDGEBIC's SQLite-to-SQL Server path, users and roles, import masks, backups, and admin housekeeping.
How Different Industries Use EDGEBIC: A Feature-by-Fit Guide
Scheduling software by industry: how paint shops, machine shops, aerospace, food, and fabricators map EDGEBIC features to their real constraints.
EDGEBIC: The Complete Guide to Next-Generation Finite Capacity Scheduling
What is EDGEBIC? A complete guide to the finite capacity scheduling platform from User Solutions: engine, routings, actuals, optimizer, and setup.
The EDGEBIC How-To Library: Every Scheduling Task, Step by Step
How to use EDGEBIC for every scheduling task: master data setup, routings, running the scheduler, actuals, and reschedules, organized by task family.
Mathematical Schedule Optimization Without a PhD
How production schedule optimization software works in EDGEBIC: a never-worse multi-run search plus a mathematical solver with a proven optimality gap.
Inventory, Forecasting, and MPS in EDGEBIC
Inventory planning software for manufacturers: how EDGEBIC's ledger, projected balances, forecasts, replenishment, and MPS connect planning to capacity.
Quoting Against Real Capacity: The EDGEBIC Quoting Guide
Quoting software for manufacturers that promises dates you can keep: EDGEBIC quote simulation prices jobs against live capacity with what-if promise dates.
The Measurable Results of Finite Capacity Scheduling with EDGEBIC
Production scheduling software ROI in real numbers: a 73% setup cut from sequencing, on-time delivery from 30% to 90%, and how to measure your own.
Inside a Modern Finite Capacity Scheduling Engine
How finite capacity scheduling works inside EDGEBIC: dependency graphs, multi-shift allocation, TOC anchors, queue time, and actuals preservation.
From Operator Punch to Updated Plan: Shop Floor Execution in EDGEBIC
Shop floor data collection scheduling in practice: kiosk punches, daily actuals, piece counts, and reschedules that never move completed work.
Why Does My Schedule Look Wrong? The EDGEBIC Troubleshooting Guide
Production schedule looks wrong? A symptom-by-symptom EDGEBIC troubleshooting guide: late starts, missing jobs, overlaps, and the first fix for each.
Run Your Factory Like a Flow Chart: Visual Scheduling in EDGEBIC
Visual production scheduling software explained: build routings as drag-and-drop flow charts, read the Gantt's bar states, and stage changes before saving.
From Empty Database to Shipped Order: EDGEBIC Worked Examples
A production scheduling software walkthrough library: ten EDGEBIC scenarios from greenfield setup to breakdown recovery, each with real numbers.
Connecting EDGEBIC to Your ERP Database With a SQL Source
How to point a scheduled EDGEBIC integration at a read-only ERP query instead of a file: testing the connection, previewing columns, checking the mask fits, and the stored-password rule that catches most teams out.
Deleting a Quote Scenario You No Longer Need in EDGEBIC
Deleting a scenario removes it and its overrides and nothing else. See what survives, why an applied scenario is safe to delete, and how to keep a quote's scenario list readable.
How to Add a Supplier and Raise a Purchase Order in EDGEBIC
The Purchasing sub-tab in four moves: create the supplier, raise the order header, add lines with a promised date, and set the one status that decides whether the scheduler believes any of it.
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.
Migrating Your Tools and Fixtures to EDGEBIC
Tools and fixtures are not one of the eight import masks, so you build the list by hand. Here is what to enter, the quantity rule that ruins schedules when it is wrong, and where tools belong in the migration sequence.
Plan on Lead Time vs Require on Hand: the Material Availability Choice
A product's Material Availability setting decides whether a job without covering supply is planned on an assumption or reported as a shortage. Here is what each choice does to the plan.
What a Plan Built on Yesterday's Data Costs You
A schedule is only as current as its last data refresh. What goes wrong when that refresh depends on someone remembering, what an automatic sync changes, and the limits worth knowing before you trust it.
What Is the Critical Chain in Manufacturing Scheduling?
The critical chain is the longest dependent path through a plan once shared machine contention is counted, not just step precedence. Here is how it differs from the critical path.
What Stock a Job Actually Drew From Inventory in EDGEBIC
A hidden window in Job View shows exactly what a job took from stock, and whether it was finished product that skipped the shop or components drawn to build it. The only way in is a double-click.
I Dragged an Operation and Nothing Happened: Fixing a Planner Drag in EDGEBIC
A drag that snaps back, stages nothing, or seems to be ignored on the EDGEBIC Planner board has a short list of causes. Read the status line, then work down this list.
