Production Planning Software That Plans to Real Capacity

Production planning software decides what your plant will make, how much and in which week, and checks that plan against the machines, people, tooling and material you actually have. EDGEBIC (RMDB 2.0) by User Solutions does it for small and mid-size manufacturers, then turns the plan into a finite capacity schedule the shop floor can run.

Built for planners and operations managers who plan in spreadsheets today, or whose ERP accepts a plan that exceeds capacity without saying so. One-time license from $25,000.

Last updated

EDGEBIC resource calendar showing utilization, assigned load and free capacity by work center and shift
Resource Calendar: utilization, backlog and free capacity by shift and work center

A Plan Is Only as Good as the Capacity Behind It

Most plans fail quietly. A spreadsheet adds up demand but not machine hours. An ERP planning module usually assumes infinite capacity, so it will accept a master schedule the plant cannot meet. The gap shows up weeks later as overtime, expediting and late orders.

EDGEBIC plans against finite capacity from the start. The plan and the production schedule come from the same model of your work centers, shifts and routings, so what you promise in the plan is what the floor can build.

What EDGEBIC Plans For You

  • Capacity by work center and shift, with utilization, backlog and free hours
  • Forward and backward finite capacity planning
  • Theory of Constraints anchoring around the bottleneck
  • Operator skills, certifications and shift rosters as real limits
  • What-if plans: extra shifts, weekend work, added machines, outside operations
  • Quoting with what-if scenarios and quote-to-order conversion
  • Two-layer optimizer, including Google OR-Tools CP-SAT
  • MRP, inventory, purchasing and material pegging in EDGEBIC Complete
  • Sub-assemblies up to 10 levels deep
  • Plans and dates exported back to your ERP
EDGEBIC optimizer workbench building a what-if variant with weekend work, longer days, added machines or outside operations
Optimizer Workbench: test a what-if variant in memory and compare it with the plan you run today

A six-month production plan that took two weeks off lead times

Technical Glass Products

Technical Glass Products, a job shop in Snoqualmie, Washington, had run RMDB for finite capacity scheduling for years when its task standards and skill balance drifted. With a few days of remote help from User Solutions, the team blended new time studies and cross-trained skills into the schedule and ran a series of what-if scenarios.

The result was a realistic master production plan six months out. By taking two weeks off lead times, TGP took on 4% more business with the same workforce while keeping its customer service standard.

Read the Technical Glass Products story

EDGEBIC vs Spreadsheets, ERP Planning Modules and Enterprise APS

Four ways manufacturers build a production plan. The row that decides whether the plan survives contact with the shop floor is the first one: does it know your real capacity?

SpreadsheetERP planning moduleEnterprise APSEDGEBIC
Plan checked against capacityOnly if you build the formulasUsually infinite capacity, so a plan can exceed it without warningYes, finiteYes, finite across machines, labor, tooling and shifts
Material in the planA separate tab, kept by handMRP with fixed lead timesYesEDGEBIC Complete: MRP, inventory, purchasing and material pegging
What-if plansCopy the fileRarelyYesYes, run in memory and compared before you accept one
Works with your ERPManual re-keyingIt is the ERPPre-built connectors to major ERPsAny ERP that exports Excel, CSV or database tables
Time to a first planHoursPart of the ERP projectMonths, usually consultant-ledDays to weeks (Plastilite: 5 days with ERP integration)
PricingFreeIncluded or an add-on moduleQuoted privately, often $50K+ before services$25,000 or $35,000, one time

EDGEBIC Pricing: Published, One-Time

Two editions of EDGEBIC by User Solutions, both perpetual licenses with updates included and no per-seat annual fee. EDGEBIC is an installed Windows application, not a subscription service. See EDGEBIC pricing and editions or how this compares with the market.

EditionWhat it includesOne-time license
EDGEBIC APSFinite capacity scheduling and optimization: graphical routing designer, forward and backward scheduling, Theory of Constraints anchoring, parallel work centers, sequence-dependent setup, lot streaming, operator skills, and a two-layer schedule optimizer.$25,000
EDGEBIC CompleteEverything in EDGEBIC APS plus MRP, inventory, purchasing and material pegging, so material availability constrains the schedule alongside machines and labor.$35,000

Works Alongside Your ERP

Keep your ERP as the system of record. Orders, routings, work centers and actuals come into EDGEBIC from Excel, CSV or database tables, and finite capacity schedules and realistic dates go back out. No middleware and no custom API project. Step-by-step integration guides:

Using a different system? Any ERP that exports Excel, CSV or database tables works. See EDGEBIC ERP integration and the ERP scheduling add-on.

Production Planning Software FAQs

See your own plan checked against real capacity

Bring a few weeks of real demand. We will load your work centers and routings into EDGEBIC and show where the plan holds and where it breaks.

Or see EDGEBIC by User Solutions or RMDB, the engine it grew from.

Request a free demo
Let's Solve Your Challenges Together