Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Featured Guides

Kanban board with sticky notes representing lean pull scheduling integrated with MRP planning
MRP

Lean-MRP Hybrid: How to Combine Pull Scheduling with MRP for Long-Lead Materials

Lean and MRP appear to conflict—but most lean shops still need MRP for long-lead purchased materials. Here's how to combine pull scheduling and MRP at the right decoupling points.

April 27, 202612 min read
Warehouse employee scanning inventory with a tablet to ensure data accuracy for MRP
MRP

MRP Data Accuracy: The #1 Reason MRP Implementations Fail (And How to Fix It)

Poor data quality kills MRP before it starts. Learn the three data pillars, how to hit the 98% inventory accuracy target, and a practical implementation checklist.

April 27, 202612 min read
Person reviewing a planning calendar, representing time fence zones in manufacturing MRP scheduling
MRP

MRP Time Fences: Frozen, Slushy, and Open Planning Zones Explained

Time fences stop MRP nervousness by protecting your near-term schedule. Learn how to set frozen, slushy, and open zones—with real examples for job shops and flow shops.

April 27, 202611 min read
Industrial storage yard with stacked steel coils representing raw material supply tracing in MRP pegging
MRP

Pegging in MRP: How to Trace Customer Orders All the Way to Raw Materials

Pegging lets you trace any MRP planned order back to its demand source—and forward from any supply shortage to the customer orders at risk. Here's how to use it.

April 27, 202611 min read
Small manufacturing shop floor with computer screen showing MRP software dashboard
MRP

Best MRP Software for Small Manufacturers in 2026

Compare the best MRP software for small manufacturers in 2026. Detailed reviews of pricing, features, ease of use, and implementation timelines to help you choose the right MRP system.

April 16, 202616 min read
Exploded view of a manufactured product showing all components and sub-assemblies in a bill of materials
MRP

Bill of Materials (BOM) Guide: Types, Structure & Best Practices

Complete guide to bills of materials in manufacturing. Learn BOM types, single vs multi-level structures, BOM accuracy best practices, and how BOMs drive MRP and production planning.

April 16, 202611 min read
Circular diagram showing the closed-loop MRP cycle from planning to execution and back to planning
MRP

Closed-Loop MRP: How Feedback Transforms Material Planning

Learn how closed-loop MRP connects planning with shop floor execution. Understand the feedback mechanisms, capacity validation, and continuous improvement cycle that make MRP effective.

April 16, 20269 min read
Manufacturing planner identifying and fixing errors in the MRP system on screen
MRP

18 Common MRP Mistakes (And How to Fix Them)

Avoid the most common MRP mistakes that cause stockouts, excess inventory, and planning failures. Practical fixes for data accuracy, parameter settings, process discipline, and system configuration issues.

April 16, 202610 min read
DDMRP buffer zones diagram showing green, yellow, and red inventory levels at strategic positions
MRP

DDMRP (Demand-Driven MRP): How It Works & When to Use It

Understand Demand-Driven MRP (DDMRP) and how it improves on traditional MRP with strategic decoupling points, dynamic buffers, and demand-driven execution. Learn when DDMRP fits your operation.

April 16, 202610 min read
Manufacturing product tree showing dependent demand flowing from finished goods to components
MRP

Dependent vs Independent Demand: The Key to Manufacturing Planning

Understand the difference between dependent and independent demand in manufacturing. Learn why this distinction drives MRP logic, inventory strategies, and material planning approaches.

April 16, 20269 min read
Custom manufacturing shop floor with unique products being built to customer specifications
MRP

MRP for Custom Manufacturing: Planning When Every Order Is Different

Learn how to apply MRP in custom and engineer-to-order manufacturing. Covers configurable BOMs, preliminary material planning, long-lead procurement, and integrating MRP with finite capacity scheduling.

April 16, 202610 min read
Project manager reviewing MRP implementation checklist with manufacturing team
MRP

MRP Implementation Checklist: 7 Phases to Go-Live Success

Complete MRP implementation checklist covering data preparation, system configuration, testing, training, go-live, and post-implementation optimization. Avoid the common pitfalls that derail MRP projects.

April 16, 202612 min read
Let's Solve Your Challenges Together