Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Featured Guides

Scheduling Concepts
Scheduling Concepts

Plan on Lead Time vs Require on Hand: the Material Availability Choice

A product's Material Availability setting decides whether a job without covering supply is planned on an assumption or reported as a shortage. Here is what each choice does to the plan.

August 22, 20267 min read
Scheduling Concepts
Scheduling Concepts

Why a Missing Tool Stops the Job Instead of Scheduling Anyway

A step whose tool is inactive, unknown, or at zero quantity fails the run immediately and names the tool. Why that refusal is a feature, not a limitation.

August 18, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why a Tool Is Held for Setup and Run Alike

An operator can tend two machines at once. A fixture cannot be half mounted. Why tools book at the full rate for every hour, with no attention fraction and no escape.

August 18, 20268 min read
Scheduling Concepts
Scheduling Concepts

One Fixture, Two Mills: How the Schedule Resolves the Clash

Two jobs on two free machines that cannot both run. A worked example of how a shared fixture splits one of them across two days without changing its hours.

August 17, 20268 min read
Scheduling Concepts
Scheduling Concepts

The Tool Constraint: The Third Thing an Operation Needs

A tool constraint models the fixture, mold, or gauge shared across every machine, so the schedule sees the one clash a normal Gantt cannot show you.

August 17, 20268 min read
Scheduling Concepts
Scheduling Concepts

What Changes When You Own a Second Fixture

Tool quantity is units you own, not machines it fits. What raising it from one to two really buys, and why inflating it is the most damaging entry in the model.

August 17, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Constraint Schedule Subordinates Every Other Step

When a job is anchored to a constraint, the engine ranks every other step below it on a descending priority ladder. How the ladder works and why upstream steps drop fastest.

August 7, 20269 min read
Scheduling Concepts
Scheduling Concepts

How to Keep a Slow Machine Out of a Machine Pool

There is no automatic efficiency screen on a pool. Four real controls decide which machines a step can use: the member list, the Active flag, the per-member factor, and the selection strategy.

August 7, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Step-Level One-Per-Day Rule Overrides the Machine

One job per day can be set on the machine or on the individual routing step. How the step-level rule wins, when to use it, and what it does to capacity on a shared machine.

August 7, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Synchronized Group Buffer Differs From Queue Time

A parallel group can carry its own buffer after the machines finish together. How that padding differs from queue time and transfer delay, and which one to use when.

August 7, 20268 min read
Scheduling Concepts
Scheduling Concepts

The Smallest Slice of Capacity a Scheduler Will Use

Why a finite capacity engine refuses to book six-minute fragments of a shift, how the minimum allocation unit prevents rounding drift, and what it means for short operations.

August 7, 20268 min read
Scheduling Concepts
Scheduling Concepts

When an Operation Must Fit Inside One Shift

Most operations spill across shifts until their hours are placed. Some cannot. How the cross-shift and partial-shift rules work, what they cost, and when to turn them off.

August 7, 20268 min read