Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Featured Guides

Worked Examples
Worked Examples

A Stock Build and a Customer Order Share One Machine: The First Run

A first schedule run walkthrough in EDGEBIC: two jobs collide on one laser, a holiday costs a day, and the furnace turns out to own three weeks of the calendar.

August 14, 202612 min read
Worked Examples
Worked Examples

An OEE Week on One Machine: 40 Hours In, 65.5% Out

A worked OEE calculation example: one CNC machine, 40 available hours, one lost day, and how availability, performance, and quality multiply out to 65.5%.

August 10, 20269 min read
Worked Examples
Worked Examples

Earned Value Mid-Job: Ahead of Schedule and Over Budget at Once

A worked earned value example on a five-step job: BAC 50 hours, AC 55, SPI 1.09 and CPI 0.91, and what to do when the two indices point opposite ways.

August 10, 20269 min read
Worked Examples
Worked Examples

A Day in the Life of a Planner: Morning Review to End-of-Day Commit

A planner daily routine walkthrough in EDGEBIC: the 20 minute morning review, the midday interruptions, the afternoon capacity check, and the end-of-day commit that the shop runs on.

August 8, 20269 min read
Worked Examples
Worked Examples

A New Planner's First Week: From First Sign-In to a Schedule the Shop Trusts

A new planner onboarding walkthrough in EDGEBIC: five days from first sign-in to a committed schedule, with what to read, what to run, and what to leave alone.

August 8, 20269 min read
Worked Examples
Worked Examples

A Quarter-End Push: Clearing 22 Late Jobs in Three Weeks

A quarter-end backlog push walkthrough in EDGEBIC: triage the late jobs report, resequence by priority, buy targeted capacity, and run the optimizer for the last mile.

August 8, 20269 min read
Worked Examples
Worked Examples

Adding a Second Operator to Break a Labor Constraint, Start to Finish

A labor constraint walkthrough in EDGEBIC: diagnose why weld jobs slide while machines sit free, certify a second operator, then watch the constraint move.

August 8, 20269 min read
Worked Examples
Worked Examples

Closing Out a Finished Job: From the Last Punch to the Variance Review

A job closeout walkthrough in EDGEBIC: verify every step, stamp the actual end, mark the job complete, then read hour variance and CPI before the next quote.

August 8, 20269 min read
Worked Examples
Worked Examples

An Operator Calls In Sick: Covering a Certified Job the Same Morning

A sick operator walkthrough in EDGEBIC: record the absence, reschedule, see which steps re-staff and which slide, and audit the pins that cost a due date.

August 8, 20269 min read
Worked Examples
Worked Examples

The Utilization Report Says CRITICAL: Finding and Fixing the Overload

An overloaded work center walkthrough in EDGEBIC: read a CRITICAL rating, drill into the backlog, find the real cause, and fix it with the cheapest lever that works.

August 8, 20269 min read
Worked Examples
Worked Examples

A Customer Asks to Pull In a Delivery: Answering It in 20 Minutes

A customer pull-in request walkthrough in EDGEBIC: change the due date, re-plan, read Days Late, and work three honest levers until the earlier date holds or you say no.

August 8, 20269 min read
Worked Examples
Worked Examples

Onboarding a New Product: From Blank Routing to First Scheduled Job

A new product onboarding walkthrough in EDGEBIC: create the product, build a six step routing with real hours, add the material, and schedule the first order end to end.

August 8, 20269 min read
Let's Solve Your Challenges Together