Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Featured Guides

Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Abrasives Manufacturing Around Presses, Cure Ovens, and Grit Changes

Abrasives scheduling that carries grit changeovers as real sequence-dependent cost, models cure ovens as finite capacity, and pools presses so batches land on a free machine.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Architectural Glass Fabrication Around the Tempering Furnace

Architectural glass fabrication scheduling that treats tempering as the constraint, groups lites by thickness and coating family, and works backward from the glazing ship date.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Filtration Products Across Media, Pleating, and Assembly

Filtration manufacturing scheduling that overlaps media converting with pleating using transfer batches, pools pleaters, and keeps assembly fed instead of starved.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Fire Protection Equipment Manufacturing Around Testing and Certification

Fire protection equipment scheduling that treats hydrostatic test stands as finite capacity, holds certification records with routing snapshots, and pools fabrication cells.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Jewelry and Precious Metal Manufacturing Around Casting and Setters

Jewelry manufacturing scheduling that treats burnout and casting as batch cycles, gates stone setting on certified setters, and works backward from a holiday season ship date.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Laboratory and Scientific Instrument Manufacturing

Laboratory instrument manufacturing scheduling that treats calibration benches and burn-in as finite capacity, carries the as-built routing per unit, and quotes honest config-to-order dates.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Musical Instrument Manufacturing Around Finish Cure and Hand Work

Musical instrument manufacturing scheduling that carries finish cure as real elapsed time, sequences the spray booth by color family, and books skilled hand work as the constraint it is.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Orthotics and Prosthetics Fabrication Around Patient Due Dates

Orthotics and prosthetics scheduling that works backward from fitting appointments, models lamination cure as elapsed time, and pools technicians by skill and certification.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Precast Concrete Around Form Beds and Cure Time

Precast concrete scheduling that treats form beds as finite capacity, carries cure time as real elapsed hours, and pools beds so pours land where a bed is actually free.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Rail Component Manufacturing Around Certification and Long Routings

Rail component scheduling that freezes routing snapshots for traceability, carries outside process transit as real time, and pools machines across long multi-week routings.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Sawmills and Lumber Processing Around Kilns and Planer Lines

Sawmill scheduling that treats the kiln as finite capacity, carries drying as real elapsed days, and pools planer and saw lines so lumber flows to whichever line is free.

August 8, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Technical Ceramics Around Kiln Cycles and Firing Batches

Technical ceramics scheduling that treats kilns as finite capacity, carries firing cycles as real elapsed hours, and groups parts by firing profile to cut wasted kiln space.

August 8, 20268 min read
Let's Solve Your Challenges Together