Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Featured Guides

Visual Scheduling
Visual Scheduling

Staged Changes on the EDGEBIC Planner Board

Nothing on the Planner board is written until you press Save Changes, and a machine-only change writes no actual dates at all. What staging protects, and what saving actually records.

August 20, 20267 min read
Visual Scheduling
Visual Scheduling

Why EDGEBIC Refuses a Drop on the Planner Board

A refused drop is never silent and never destructive. EDGEBIC keeps the machine, keeps your time shift, and puts the reason on the status line. Here is every refusal and what it means.

August 20, 20267 min read
Visual Scheduling
Visual Scheduling

Why Planner View Focus Is Never Saved in EDGEBIC

Clicking a bar re-orders the machine block for as long as you are looking at it. It is a way of seeing, not a setting, so it never touches your saved configuration.

August 19, 20267 min read
Visual Scheduling
Visual Scheduling

Dropping an Operation Back on Its Own Machine in EDGEBIC

On the Planner board, dropping an operation on the machine it already runs on is read as a re-time, never as a second assignment. And a drop with no time change stages nothing at all.

August 18, 20266 min read
Visual Scheduling
Visual Scheduling

Why an Operation Appears Twice in the EDGEBIC Planner View

On the Planner board every operation draws on its job lane and on its machine lane. It is one operation drawn twice, not a duplicate, and the two bars always move together.

August 17, 20267 min read
Visual Scheduling
Visual Scheduling

The Planner View in EDGEBIC: Jobs and Machines on One Board

The Planner view puts a block of job lanes above the full machine list on one Schedule View board, so a routing and the plant's load read together and a drag between them assigns work.

August 17, 20266 min read
Visual Scheduling
Visual Scheduling

Choosing the Right Schedule View in EDGEBIC

EDGEBIC has several production schedule views, and each answers a different question. A guide to picking the right surface for the plant, one machine, one job, or load.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

Following a Job From the Gantt to Its Routing in EDGEBIC

A bar on the schedule board is a doorway. The drill-down path from one Gantt bar to the job's hours, its change history, and the routing it is actually running.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

How the EDGEBIC Gantt Refreshes After a Change

Why the schedule board sometimes patches a few bars and sometimes reloads everything, what each behavior protects, and the one case that clears your pending drags.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

Reading Parallel and Alternate Branches on the EDGEBIC Canvas

Three connector types, three very different meanings. How the EDGEBIC routing designer draws a sequential step, a parallel machine, and a true alternative.

August 8, 20268 min read
Visual Scheduling
Visual Scheduling

Sharing a Gantt Configuration Across Planners in EDGEBIC

Tune the schedule display once, then export it and import it everywhere. How EDGEBIC separates per-machine display settings from site-wide scheduling policy.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

Showing Live Progress on Routing Diagram Nodes in EDGEBIC

Turn a routing diagram into a status board: how Node Display Fields put planned hours, actual hours, and dates under each node of a scheduled job.

August 8, 20267 min read
Let's Solve Your Challenges Together