Production Scheduling for Heavy Equipment & Industrial Manufacturers

Multi-location. Multi-month horizons. Mission-critical on-time delivery. Proven with Cummins, GE, and leading industrial manufacturers.

Heavy Industry Scheduling Challenges

Heavy equipment and industrial manufacturers operate at a scale and complexity where scheduling failures translate directly into massive cost overruns, missed contracts, and customer churn. Standard ERP scheduling modules were not built for this reality.

  • Multi-location operations (30+ sites) with no unified scheduling
  • Long scheduling horizons (6+ months) for labor and capacity planning
  • Fleet management at scale (180,000+ units requiring scheduled maintenance)
  • ERP systems that lack finite capacity scheduling capabilities
  • Aged inventory accumulating due to poor schedule visibility
  • On-time shipping rates stuck at 30% due to unrealistic scheduling

How RMDB Serves Heavy Industry

RMDB delivers finite capacity scheduling that scales across dozens of locations and months of planning horizon. It integrates with your existing ERP as a powerful scheduling add-on, giving you the realistic capacity visibility your current system cannot provide.

  • Multi-site scheduling across 30+ locations
  • Labor scheduling months in advance for workforce planning
  • Workcenter capacity tracking to prevent overbooking
  • Master repair schedule creation for fleet maintenance
  • Cycle time improvement through bottleneck identification
  • ERP add-on integration (works alongside existing systems)
  • Reduced aged inventory through better schedule visibility
  • What-if analysis for evaluating new contract capacity

Proven Results in Heavy Industry

30→90%

On-time shipping improvement across all repair shops

GE Railcar Services

33 Sites

Multi-location scheduling with 6-month planning horizon

Cummins Engine

180K+

Railcars managed with optimized repair scheduling

GE Railcar Services

Reduced

Aged inventory and increased on-time shipments

Large Sawmill Operations

Frequently Asked Questions

Ready to scale your production scheduling?

Schedule a free consultation to see how RMDB can bring finite capacity scheduling to your multi-location operation.

Let's Solve Your Challenges Together