Production Planning and Scheduling Solutions

Address your scheduling challenges and boost your company's efficiency, profitability, and competitiveness with a solution that fits, JUST RIGHT!

Discover powerful Production Planning and Scheduling Solutions that help manufacturers solve challenges and boost efficiency—from a powerful Excel Add-On to advanced APS software that works either standalone or integrates with your ERP or any system.

We look forward to working with you to resolve your most pressing issues. Reduce or eliminate late deliveries, cut expediting costs, and optimize labor and workcenter demands to improve customer service, minimize inventory costs, and so much more.

Could you benefit from a system that gives you an end-to-end view of your entire supply chain? And gives you options to accommodate rush orders, and even deal with outside issues such as weather, hunting season, power outages, no shows on Labor, outside vendors for processing or material problems.

Let’s work together to solve the most pressing issues, as fast and easy as possible, then move on to next one!

Contact US today to discuss which product fits your budget and application.

  • EDGEBIC APS

    $25,000

    Advanced planning and scheduling

    A plan the shop can actually run

    Finite capacity scheduling for a plant that already knows what it needs to build. Every date the plan gives you is one the machines, shifts and people can genuinely hit.

    • Finite capacity scheduling, forward and backward
    • Schedule optimization, never worse than the plan you had
    • Multi-shift capacity with holidays, downtime and overrides
    • The Planner view: jobs and machines on one screen
    • Drag and drop, staged until you save
    • One live plan shared across every workstation
    • Sequence-dependent setup, work center groups and alternates
    • ERP integration by import and export
  • EDGEBIC Complete

    $35,000

    Planning, materials and inventory

    The whole planning stack, one system

    Everything in APS, plus the material side. Work out what to build and what to buy, and see the jobs that are waiting on a delivery instead of finding out on the floor.

    Everything in EDGEBIC APS, plus:

    • Multi-level MRP with dependent demand
    • Inventory: on-hand ledger, projected balance, available to promise
    • Master production schedule
    • Purchasing, suppliers and receiving
    • Material pegging: a job waits for the order that covers it
    • Sales orders and firm demand

Already running RMDB, EDGEBI or Resource Manager for Excel? See what changes when you move to EDGEBIC, or talk to us about which edition fits.

Choose the Right Solution for Your Business

Compare the two EDGEBIC editions to find the perfect fit.

FeaturesEDGEBIC APS$25,000 · Advanced planning and schedulingEDGEBIC Complete$35,000 · Planning, materials and inventory
Finite Capacity Scheduling
Schedules orders against the real capacity of the plant: shift calendars, holidays, downtime, machine instances and operator skills. Forward from a start date or backward (just-in-time) from a due date, per job or group of orders.
Schedule Optimization
The optimizer evaluates dozens of complete schedules and keeps the best one. The result is never worse than the plan you already had.
Multi-Shift Capacity
Day, night and weekend patterns per work center, with holidays, downtime and per-day overrides the engine actually respects.
Visual Routing Designer (Bill of Resources)
Build routings as a flow chart: every operation is a node and every dependency is an arrow, so you can lay out your whole factory the way you would sketch it on a whiteboard.
The Planner View with Drag and Drop
Your jobs and your machines on one screen. Drag an operation from a job straight onto the machine that will run it. Every change is staged, so nothing commits until you save.
Multi-User Live Plan
Planners and supervisors share one live plan on SQL Server, and open screens pick up shop-floor changes on their own.
Sequence-Dependent Setup, Groups and Alternates
Setup times that depend on what ran before, work center groups, and alternate routings the scheduler can choose between.
Tracking Actuals
Update any step without updating the others: the system assumes predecessors are done and rebalances the rest of the schedule.
ERP Integration
Import items, work centers, routings and orders through Excel, CSV and database import-export, apply the finite capacity scheduling your ERP cannot, and send realistic dates back out.
The material side: EDGEBIC Complete only
Multi-Level MRP
Material requirements planning with dependent demand across every BOM level: work out what to build and what to buy, and when.
-
Inventory Management
On-hand ledger, projected balance and available to promise, so the plan always knows what is really in stock.
-
Master Production Schedule
A top-level build plan that drives scheduling and material requirements together.
-
Purchasing, Suppliers and Receiving
Raise purchase orders from scheduled demand, track suppliers, and receive against open orders.
-
Material Pegging
A job waits for the delivery that covers it, so material availability constrains the schedule instead of surprising the floor.
-
Sales Orders and Firm Demand
Capture firm customer demand and let it drive the plan alongside forecast.
-

Save Time

Reduce planning time by up to 75% with automated scheduling

Increase Efficiency

Optimize resource utilization and reduce bottlenecks

Better Collaboration

Real-time visibility across all teams and departments

Not sure which solution is right for you?

Let's Solve Your Challenges Together