Job Shop Scheduling Software
Job shop scheduling software plans high-mix, low-volume work where every order can take its own route through shared work centers. It schedules against the constraints that actually decide the week (machines, skilled operators, tooling and material) instead of assuming they are always free, so the dates you quote are dates you can keep.
EDGEBIC (RMDB 2.0) by User Solutions is finite capacity job shop scheduling that works alongside SAP, Epicor, QuickBooks or any ERP without replacing it: orders and routings come in, realistic promise dates go back out. One-time license from $25,000. Homestead Furniture moved its basic weekly schedule from a 40-hour scheduler task to a 2-hour clerk task.
Last updated

Why Job Shops Need Specialized Scheduling Software
Job shops operate differently from repetitive or flow-shop manufacturers. Every customer order can have a unique routing, different resource requirements, and unpredictable lead times. Generic ERP scheduling modules use infinite capacity planning that ignores real-world constraints, producing schedules that fall apart on the shop floor. Job shop software like RMDB is built specifically for this complexity.
Whether you run a machine shop, tool-and-die operation, sheet metal fabricator, or custom parts manufacturer, your scheduling challenges are fundamentally different from assembly-line production. You need shop scheduling software that understands shared resources, variable routings, and the constant flux of priorities that define job shop manufacturing.
Common Job Shop Scheduling Challenges
Job shops face scheduling complexities that generic ERP systems cannot handle. Every order may follow a different routing, demand is unpredictable, and resources are shared across dozens of active jobs. If any of these sound familiar, you need dedicated job shop scheduling software:
- Volatile order mix with constantly changing priorities
- Manual scheduling consuming 40+ hours per week
- Late deliveries damaging customer relationships
- No visibility into true capacity constraints
- No way to answer "what if" about a new order
- An ERP that cannot schedule to finite capacity
- Overbooked resources causing bottlenecks and overtime
- Delivery dates quoted without checking the shop
How RMDB Solves Job Shop Scheduling
Resource Manager DB (RMDB) was built for the reality of job shop manufacturing. As purpose-built job shop management software, it considers all constraints simultaneously (machines, labor, materials and tooling) to create schedules that work on the shop floor. Unlike generic scheduling tools, RMDB handles the variable routings, shared work centers and priority changes that define job shop operations. EDGEBIC, the current generation of RMDB, keeps that engine and puts a drag-and-drop planning board, an optimizer and what-if scenarios on top of it.
- True finite capacity scheduling across all resources
- What-if scenario analysis to evaluate new orders before committing
- Drag-and-drop visual scheduling on the EDGEBIC planning board
- Flexible Bill of Resources adapts to your unique routings
- Mixed forward and reverse scheduling modes
- Direct ERP integration via Excel, CSV or ODBC
- Multi-constraint planning across labor, machines and materials
- Sequence-dependent setups charged at their real length
- Operator skills and certifications as a scheduling constraint
- Real-time capacity visibility to prevent overbooking

How Job Shop Software Works With Your Existing Systems
RMDB is designed to complement, not replace, your existing shop management software or ERP. It works as a scheduling add-on for your ERP that fills the gap between basic planning and true finite capacity scheduling. Here is how the integration works:
01
Import your data
Pull orders, routings and resource data from your ERP, Excel spreadsheets or databases. RMDB connects to SAP, Oracle, Epicor, Sage, JobBOSS and effectively any system via CSV or ODBC.
02
Schedule to real capacity
RMDB schedules every job against finite capacity using your actual machines, labor pools and material availability. The result is a plan the shop can run, not an infinite capacity fantasy.
03
Visualize and adjust
Use the EDGEBIC planning board and Gantt views to see the schedule, drag to reprioritize, and run what-if scenarios before you commit to a delivery date.
Key Capabilities for Job Shop Management
Finite capacity scheduling
Schedule every job against actual machine and labor capacity. RMDB never overbooks a resource, so the schedule reflects what can actually happen on the floor. That matters most in job shops, where shared work centers create dependencies between jobs that no lead time can model.
What-if scenario planning
Before accepting a rush order, see exactly what it pushes out. RMDB models scenarios without touching the live schedule. Turner Suspension Bicycles used this to win its largest customer order, by showing the client a delivery timeline it could stand behind.
Multi-constraint resource planning
Job shop work often needs a specific operator and a specific machine and the right tooling, all at once. RMDB schedules across every constraint type together: machines, labor skills, tooling, materials and bills of materials. No more booking a machine to find the operator is already committed.
On-time delivery
Late delivery is the number-one complaint in job shops. Schedules that respect capacity let you commit to dates you can meet: manufacturers using RMDB have taken on-time delivery from as low as 30% to over 90%.
EDGEBIC vs Spreadsheets, Shop Management Systems and Enterprise APS
Four ways a job shop plans its week. What decides whether the plan holds is whether it knows the real capacity of a shared work center, and how fast it re-plans when a rush order lands.
| Spreadsheet | Shop management system / ERP | Enterprise APS | EDGEBIC | |
|---|---|---|---|---|
| Capacity model | Whatever you build by hand | Usually infinite capacity with fixed lead times | Finite, deep constraint modelling | Finite across machines, labor, materials and tooling |
| One routing per order | Copy and edit each time | Works, but rigid to change | Yes | Bill of Resources drawn as a flow chart, edited per job |
| Quoting a delivery date | Judgement | Lead time arithmetic | Simulation | What-if scenario against the live schedule |
| When a rush order lands | Rebuild the sheet | Rerun the regen, often overnight | Replans | Drag an operation and everything downstream re-plans |
| Labor and skills | A separate roster | Rarely a constraint | Yes | Operator skills, certifications and shift rosters |
| Implementation | Hours | Part of the ERP project | Months, usually consultant-led | Days to weeks (Homestead: live within weeks) |
| Pricing | Free | Included or an add-on module | Annual per-seat subscription or a $50K+ project | $25,000 or $35,000, one time |
The basic weekly schedule went from a 40-hour scheduler task to a 2-hour clerk task
Homestead Furniture
An Amish custom furniture shop with highly variable routings had one person building the weekly schedule by hand, a full working week of effort that was obsolete as soon as priorities moved.
With the routings modelled in RMDB, producing the basic weekly schedule became a two-hour clerical job, and the shop could reconfigure the system on the fly as new routings appeared.
Proven Results in Job Shop Manufacturing
- Basic weekly schedule moved from a scheduler task to a clerk taskHomestead Furniture
- 40 to 2 hrs
- More business taken on with the existing workforceTechnical Glass Products
- 4%
- Won by showing the customer a what-if Gantt chart of the real timelineTurner Suspension Bicycles
- Largest order
- On-time shipping in a repair operation with unpredictable work contentGE Railcar Services
- 30 to 90%
EDGEBIC Pricing: Published, One-Time
Two editions of EDGEBIC by User Solutions, both perpetual licenses with updates included and no per-seat annual fee. EDGEBIC is an installed Windows application, not a subscription service. See EDGEBIC pricing and editions or how this compares with the market.
| Edition | What it includes | One-time license |
|---|---|---|
| EDGEBIC APS | Finite capacity scheduling and optimization: graphical routing designer, forward and backward scheduling, Theory of Constraints anchoring, parallel work centers, sequence-dependent setup, lot streaming, operator skills, and a two-layer schedule optimizer. | $25,000 |
| EDGEBIC Complete | Everything in EDGEBIC APS plus MRP, inventory, purchasing and material pegging, so material availability constrains the schedule alongside machines and labor. | $35,000 |
Works Alongside Your ERP
Keep your ERP as the system of record. Orders, routings, work centers and actuals come into EDGEBIC from Excel, CSV or database tables, and finite capacity schedules and realistic dates go back out. No middleware and no custom API project. Step-by-step integration guides:
- EDGEBIC with SAP
- EDGEBIC with Epicor
- EDGEBIC with NetSuite
- EDGEBIC with Microsoft Dynamics
- EDGEBIC with QuickBooks
- EDGEBIC with Sage
- EDGEBIC with JobBOSS
- EDGEBIC with Infor
- EDGEBIC with Acumatica
- EDGEBIC with Odoo
- EDGEBIC with Fourth Shift
- EDGEBIC with SYSPRO
- EDGEBIC with Global Shop Solutions
- EDGEBIC with Plex
- EDGEBIC with IQMS / DELMIAworks
- EDGEBIC with Made2Manage
Using a different system? Any ERP that exports Excel, CSV or database tables works. See EDGEBIC ERP integration and the ERP scheduling add-on.
Types of Job Shops Using RMDB
RMDB serves a wide range of job shop and custom manufacturing operations. Any shop with variable routings, shared resources and make-to-order production can use it:
- CNC machine shops and precision machining
- Tool-and-die and mold making
- Sheet metal fabrication shops
- Custom woodworking and furniture manufacturing
- Contract manufacturing and subcontracting
- Specialty glass and materials processing
- Repair and overhaul operations
- Prototype and short-run production
- Multi-process metal fabrication
Shop-specific pages: machine shop scheduling, CNC shop scheduling and finite capacity scheduling.
Frequently Asked Questions About Job Shop Scheduling Software
Job Shop Success Stories
How job shops took control of their production scheduling with RMDB.
Woodworking
Amish Manufacturer Rapidly Amortizes Scheduling System
Homestead Furniture
Read storyGlass Manufacturing
Job Shop Increases Throughput and On-Time Shipping
Technical Glass Products
Read storyConsumer Products
Production What-If Scenario Secures Largest Customer Order
Turner Suspension Bicycles
Read storyExplore Related Solutions
Discover how these capabilities work together to transform your manufacturing operations.
Finite Capacity Scheduling
Schedule to real machine, labor, and material limits
Learn moreWhat-If Analysis
Simulate scenarios before committing to production
Learn moreExcel to Scheduling Software
Upgrade from spreadsheets without losing familiarity
Learn moreOn-Time Delivery
Improve OTD with realistic capacity-based dates
Learn moreProduction Scheduling
Finite capacity planning, MRP, and ERP integration
Learn moreSee your own job shop week scheduled to real capacity
Book a free live demo and bring your own data. Open orders, routings and work center hours are enough to build a realistic schedule in the session.
Or see RMDB features, EDGEBIC by User Solutions or pricing and editions.