Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Troubleshooting
Troubleshooting

Another User Changed This Record: Causes and Fixes

EDGEBIC refuses a save when the record moved after you loaded it. The usual cause is a colleague, but the message also appears when you are alone. How to read it and what to do.

August 10, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Deciding ERP Import Frequency by Data Type

Set a refresh cadence per data type instead of one global schedule: why work orders come daily, routings come on change, and why re-importing everything nightly costs more than it gives.

August 10, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Handling an ERP Export That Changed Column Order

When an ERP export adds, moves, or renames columns, here is how an EDGEBIC import mask reacts, which changes are safe, and the ten-minute repair that keeps the schedule honest.

August 10, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

How an Open EDGEBIC Screen Notices Someone Else's Edit

On a shared database, a change made on one workstation reaches every other open screen within a few seconds, without anybody pressing anything. How the change signal works and why your selection survives it.

August 10, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

How Many Import Masks Your Shop Actually Needs

Five masks cover most shops, and the reasons to add a sixth are specific. How to decide when a second mask on the same data type helps and when it just doubles maintenance.

August 10, 20268 min read
EDGEBIC How-To
EDGEBIC How-To

How to Check Where a Dashboard Number Comes From in EDGEBIC

Every EDGEBIC dashboard tile carries an info icon and a data-quality chip: how to check a KPI's formula and source, and how to confirm it in the report layer.

August 10, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Compare Planned and Actual Hours per Work Center in EDGEBIC

The Plan vs Actual tab in the EDGEBIC utilization report ranks work centers by the gap between planned and actual hours: how to read it and what a gap means.

August 10, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Delete a Work Center in EDGEBIC (and Why It Sometimes Refuses)

Delete a work center in EDGEBIC, clear the routing, schedule, and override references that block the delete, and know when deactivating the machine is the better answer.

August 10, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Find At-Risk Jobs on the EDGEBIC Dashboard

The At-Risk Jobs grid on the EDGEBIC dashboard lists jobs whose projected end passes the due date: how to open it and drill to the Late Jobs report.

August 10, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Read the Bottleneck Tile in EDGEBIC

The Bottleneck tile and its Focus Area badge name the constraint work center on the EDGEBIC dashboard: how to read it and what a dash really means.

August 10, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Read the Top Jobs by Load Tab in EDGEBIC

The Top Jobs by Load tab in the EDGEBIC utilization report ranks the heaviest jobs in the plant: how to open it and turn one heavy job into a decision.

August 10, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Read the Work Center Capacity Detail Grid in EDGEBIC

The Work Center Capacity Detail grid on the EDGEBIC dashboard puts total, assigned and available hours in one table: how to read every column and act on it.

August 10, 20266 min read
Let's Solve Your Challenges Together