Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC How-To
EDGEBIC How-To

How to Override Capacity for One Day in EDGEBIC

How to change a work center's hours for a single day in EDGEBIC: the per-day capacity override dialog, why the number is the day total, and how to undo it.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Pause a Job With a Reason Code in EDGEBIC

Pause a job with a reason code at the shop floor terminal so downtime is recorded honestly and never counted as production hours on the operation.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Print a Dispatch List for a Work Center in EDGEBIC

The Work Center Dispatch report in EDGEBIC is the run queue you hand each station: how to filter it to one work center, read Rem Hrs, and print the shift sheet.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Put a Job On Hold in EDGEBIC

Put a job on hold in EDGEBIC by keeping it out of the run and clearing its schedule to release capacity, then bring it back when the blocker clears.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Read the Capacity Heatmap in EDGEBIC

The 14-day capacity heatmap in EDGEBIC colors every work center and day by load: how to find it, read a cell, tell a holiday from an idle day, and drill into the jobs.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Record a Partially Finished Operation in EDGEBIC

Record a partially finished operation as a short-confirm so logged hours stay locked as history and the remaining hours re-plan forward on reschedule.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Record a Piece Count in EDGEBIC

Record a piece count two ways: tap good and scrap counters at the kiosk with reasons, or type daily pieces into the planner's Log Actuals grid.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Reopen a Completed Operation in EDGEBIC

Reopen a completed operation by clearing its actual end so the scheduler treats it as in progress again and re-plans the remaining work forward.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Reorder Routing Steps in EDGEBIC

Reorder routing steps in EDGEBIC the way the scheduler actually reads them: change the next-in-sequence links, not just the sequence numbers, then verify the chain.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Run the Earned Value Report in EDGEBIC

The earned value report in EDGEBIC ranks jobs by SPI and CPI in hours: how to run it, read the two indexes together, and use EAC to forecast the landing point.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Run the Late Jobs Report in EDGEBIC

The late jobs report in EDGEBIC ranks every job whose scheduled end passes its due date: how to run it, read the blocker hint, and act on the worst rows first.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Run the OEE Report in EDGEBIC

The OEE report in EDGEBIC scores availability, performance and quality per work center: how to run it, why quality reads n/a, and how to fix each factor.

July 26, 20267 min read