Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Quoting & Promising
Quoting & Promising

Pricing a Quote From the Schedule in EDGEBIC

EDGEBIC prices a quote from the schedule it just simulated: labor from real work hours, material from routing steps, then markup. See the cost math and the override.

July 31, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

ProShop Scheduling Gaps (And How EDGEBIC Fills Them)

ProShop finite capacity scheduling gaps that shops report: load views without sequencing, flat work center capacity, sequence-dependent setups, and slow what-if answers.

July 31, 20269 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

ProShop to EDGEBIC: The Data Mapping Reference

ProShop data export scheduling field by field: map parts, work centers, routings, orders and hours into EDGEBIC masks, with conversions and upsert rules.

July 31, 202610 min read
Quoting & Promising
Quoting & Promising

Quoting When the Shop Is Already Full in EDGEBIC

When the backlog is deep, EDGEBIC quotes an honest date and shows your options. See how to read a far-out simulation and use scenarios to find the date the customer needs.

July 31, 20268 min read
Shop Floor Execution
Shop Floor Execution

Reading a Shift Handoff Summary in EDGEBIC

The shift handoff summary shows the oncoming crew what they are inheriting: setup, run, and down hours, piece totals, and recent pauses with reasons. Here is how to read it.

July 31, 20268 min read
Visual Scheduling
Visual Scheduling

Reading Dependencies on the EDGEBIC Design Canvas

Learn to read routing dependencies on the EDGEBIC canvas: connector arrows carry next-in-sequence, branches merge, and a warning icon flags a broken chain.

July 31, 20269 min read
Visual Scheduling
Visual Scheduling

Reading Operation Description Fields on a Gantt Bar

Every EDGEBIC Gantt bar caption is built from tokens: job, product, dates, and hours. Learn to read the operation description fields and set them per work center.

July 31, 20269 min read
Visual Scheduling
Visual Scheduling

Reading the Work Center Lanes on the EDGEBIC Schedule

The EDGEBIC Gantt puts one lane per work center. Learn to read the lanes: bars stack per machine, instances share load, and moving between lanes reroutes a job.

July 31, 202610 min read
Upgrade & Comparison
Upgrade & Comparison

Running RMDB and EDGEBIC Side by Side During the Transition

The safest way to adopt EDGEBIC is a parallel run: RMDB stays the system of record while EDGEBIC schedules one cell. Because EDGEBIC imports from Excel, it needs no special setup.

July 31, 20268 min read
Visual Scheduling
Visual Scheduling

Spotting a Bottleneck on the EDGEBIC Gantt

Learn to spot a bottleneck on the EDGEBIC Gantt: a lane packed wall to wall, work stacking upstream, and downstream operations flagged for review after a change.

July 31, 202610 min read
Outcomes & ROI
Outcomes & ROI

The Capacity You Already Have But Cannot See

The cheapest capacity is the hours you already own and cannot see. See how scheduling finds them without capex, with worked arithmetic and honest limits.

July 31, 20269 min read
Shop Floor Execution
Shop Floor Execution

The Daily Rhythm of a Kiosk-Run Shop with EDGEBIC

A shop that punches at the kiosk and reschedules on a rhythm keeps promise dates honest. Here is the operator-to-planner cadence that makes it work.

July 31, 20269 min read
Let's Solve Your Challenges Together