Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
How the Designer Shows Sub-Assembly Branches
See how the EDGEBIC designer draws a sub-assembly branch: a star-marked node feeding a merge point, a routing that explodes at schedule time, and how to preview it.
How the Gantt Shows a Job Spanning Shifts
See how the EDGEBIC Gantt draws an operation across shifts and days: bars follow shift calendars, skip weekends and holidays, and split work across instances.
How the EDGEBIC Optimizer Cuts Total Setup Time
The EDGEBIC optimizer can sequence jobs to slash changeover hours the base scheduler never sees, modeling sequence-dependent setup as a solvable circuit. Here is the mechanism.
How a Warm Start Makes Schedule Optimization Fast
The EDGEBIC optimizer warm-starts from the base scheduler's plan, using it as both a head start and the never-worse floor. Here is why that makes optimization fast and safe.
IQMS / DELMIAworks Scheduling Gaps (And How EDGEBIC Fills Them)
DELMIAworks finite capacity scheduling gaps that plants report: infinite-capacity dates, flat press capacity, color and material changeovers, and slow what-if answers.
IQMS / DELMIAworks to EDGEBIC: The Data Mapping Reference
DELMIAworks data export scheduling field by field: map items, work centers, routings, orders and hours into EDGEBIC masks, with cycle-time conversions and upsert rules.
Is AI Production Scheduling Real? An Honest Look
The EDGEBIC optimizer is math and search, not AI magic. Here is an honest account of what it actually does, why 'never worse' and 'proven optimal' beat vague AI claims.
Moving Your RMDB Routings Into EDGEBIC
Move your Resource Manager DB routings into EDGEBIC through import masks. Export to Excel, map columns once, and let the two-pass routing import wire step sequences for you.
Planned, In-Progress, and Completed Work Explained (EDGEBIC)
Every operation sits in one of three zones at reschedule time. Learn what planned, in-progress, and completed mean in EDGEBIC and how each is handled.
Planning an EDGEBIC Pilot on One Cell
The proven way to adopt EDGEBIC is a pilot on one cell. Pick the area, import its data, verify capacity, compare dates, and expand only when the planners trust the result.
Plex Scheduling Gaps (And How EDGEBIC Fills Them)
Plex finite capacity scheduling gaps that plants report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, and slow what-if promise dates.
Plex to EDGEBIC: The Data Mapping Reference
Plex data export scheduling field by field: map items, work centers, routings, orders and hours into EDGEBIC masks, with conversions and upsert rules.
