Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Visual Scheduling
Visual Scheduling

How the Designer Shows Sub-Assembly Branches

See how the EDGEBIC designer draws a sub-assembly branch: a star-marked node feeding a merge point, a routing that explodes at schedule time, and how to preview it.

July 31, 202610 min read
Visual Scheduling
Visual Scheduling

How the Gantt Shows a Job Spanning Shifts

See how the EDGEBIC Gantt draws an operation across shifts and days: bars follow shift calendars, skip weekends and holidays, and split work across instances.

July 31, 202610 min read
Schedule Optimization
Schedule Optimization

How the EDGEBIC Optimizer Cuts Total Setup Time

The EDGEBIC optimizer can sequence jobs to slash changeover hours the base scheduler never sees, modeling sequence-dependent setup as a solvable circuit. Here is the mechanism.

July 31, 20268 min read
Schedule Optimization
Schedule Optimization

How a Warm Start Makes Schedule Optimization Fast

The EDGEBIC optimizer warm-starts from the base scheduler's plan, using it as both a head start and the never-worse floor. Here is why that makes optimization fast and safe.

July 31, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

IQMS / DELMIAworks Scheduling Gaps (And How EDGEBIC Fills Them)

DELMIAworks finite capacity scheduling gaps that plants report: infinite-capacity dates, flat press capacity, color and material changeovers, and slow what-if answers.

July 31, 20269 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

IQMS / DELMIAworks to EDGEBIC: The Data Mapping Reference

DELMIAworks data export scheduling field by field: map items, work centers, routings, orders and hours into EDGEBIC masks, with cycle-time conversions and upsert rules.

July 31, 202610 min read
Schedule Optimization
Schedule Optimization

Is AI Production Scheduling Real? An Honest Look

The EDGEBIC optimizer is math and search, not AI magic. Here is an honest account of what it actually does, why 'never worse' and 'proven optimal' beat vague AI claims.

July 31, 20269 min read
Upgrade & Comparison
Upgrade & Comparison

Moving Your RMDB Routings Into EDGEBIC

Move your Resource Manager DB routings into EDGEBIC through import masks. Export to Excel, map columns once, and let the two-pass routing import wire step sequences for you.

July 31, 20268 min read
Shop Floor Execution
Shop Floor Execution

Planned, In-Progress, and Completed Work Explained (EDGEBIC)

Every operation sits in one of three zones at reschedule time. Learn what planned, in-progress, and completed mean in EDGEBIC and how each is handled.

July 31, 20269 min read
Upgrade & Comparison
Upgrade & Comparison

Planning an EDGEBIC Pilot on One Cell

The proven way to adopt EDGEBIC is a pilot on one cell. Pick the area, import its data, verify capacity, compare dates, and expand only when the planners trust the result.

July 31, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Plex Scheduling Gaps (And How EDGEBIC Fills Them)

Plex finite capacity scheduling gaps that plants report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, and slow what-if promise dates.

July 31, 20269 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Plex to EDGEBIC: The Data Mapping Reference

Plex data export scheduling field by field: map items, work centers, routings, orders and hours into EDGEBIC masks, with conversions and upsert rules.

July 31, 202610 min read
Let's Solve Your Challenges Together