Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Visual Scheduling
Visual Scheduling

The Data Grid vs the Flow Chart View of a Routing

EDGEBIC gives a routing two views: a data grid for numbers and a flow chart for structure. Learn which to use when, and why they are one routing, not two.

July 31, 20269 min read
Schedule Optimization
Schedule Optimization

The Fastest-Overall-Finish Optimizer Preset Explained

The MinMakespan optimizer goal in EDGEBIC compresses a plan end to end to free capacity soonest. Here is how it ranks a schedule and when to choose it over due dates.

July 31, 20268 min read
Schedule Optimization
Schedule Optimization

The Least-Setup-Time Optimizer Preset Explained

The MinSetup optimizer goal in EDGEBIC groups compatible jobs to cut changeover hours. It needs a setup matrix to appear. Here is how it ranks a schedule and when to use it.

July 31, 20268 min read
Schedule Optimization
Schedule Optimization

The Fewest-Changes Optimizer Preset Explained

The MostStable optimizer goal in EDGEBIC improves a plan while disturbing a committed floor as little as possible. Here is how it ranks stability first and when to use it mid-week.

July 31, 20268 min read
Schedule Optimization
Schedule Optimization

The On-Time-First Optimizer Preset Explained

On-time first is the default EDGEBIC optimizer goal: it protects due dates above everything else using a four-tier objective. Here is exactly how it ranks a schedule.

July 31, 20268 min read
Visual Scheduling
Visual Scheduling

The Planned vs Actual Overlay as a Variance Tool

EDGEBIC keeps plan and reality side by side on every bar, turning the Gantt into a variance tool. See how Applied, Rescheduled, and the hours roll-up expose drift.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

The Productivity Gain Hiding in a Shorter Planning Cycle

The planner's week is a productivity line item. See how a computed schedule turns days of rebuilding into hours of review, with heritage arithmetic and honest limits.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

The Quality Gain From Not Rushing Jobs

Rushed jobs make scrap and rework. See how realistic scheduling protects quality by removing the rush, with yield arithmetic and the honest limits.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

The Throughput Gain From Cutting Setups

Setup hours you cut become throughput you can sell. See how sequencing turns changeover savings into extra jobs, with paint-booth arithmetic and honest limits.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

The True Cost of a Single Late Job

One late job costs far more than the penalty. Add up the expediting, overtime, disruption, and lost trust, with a worked breakdown and honest limits.

July 31, 20269 min read
Schedule Optimization
Schedule Optimization

The Two Layers of the EDGEBIC Optimizer Explained

EDGEBIC ships two schedule optimizers: a never-worse multi-run search and a CP-SAT mathematical solver with a proven optimality gap. Here is when to use each.

July 31, 20269 min read
Visual Scheduling
Visual Scheduling

Using Timeline Zoom to Plan a Week or a Day

Zoom the EDGEBIC Gantt to match the decision: a month view for capacity, a day view for dispatch. See how timescale, horizon, and Today reshape the schedule view.

July 31, 202610 min read
Let's Solve Your Challenges Together