Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC Platform
EDGEBIC Platform

The EDGEBIC Visual Routing Editor Explained: Draw the Process

How the EDGEBIC visual routing editor lets you build a product's routing as a diagram of connected steps, so branches, alternates, and parallel work read as a picture rather than rows in a grid.

August 5, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

The EDGEBIC Work Center Schedule View Explained: One Station, One Screen

How the EDGEBIC work center schedule view zooms the plan down to a single station, so a supervisor sees exactly what one machine runs and in what order without the noise of the whole plant.

August 5, 20268 min read
Worked Examples
Worked Examples

Exporting a Committed Schedule for the Shop Floor in EDGEBIC

Commit a schedule, then hand it to the floor: export the Job View and per-work-center grids to Excel snapshots and read the dispatch list, with an honest note on what exports and what does not.

August 5, 20268 min read
Worked Examples
Worked Examples

From a Sales Order to a Scheduled Job in EDGEBIC

Enter a customer sales order, confirm it, link it to a manufacturing order, schedule the job, and track it under the customer in the grouped order view, with every field and status shown.

August 5, 20269 min read
Inventory & Planning
Inventory & Planning

How Lead Time Offsets a Replenishment Release Date in EDGEBIC

Why a build needs to release before its due date: the release-equals-need-minus-lead-time arithmetic in EDGEBIC, and where automatic multi-level offsetting is roadmap.

August 5, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Allow Parallel Processing in a Scenario in EDGEBIC

Turn on Parallel Processing in an EDGEBIC what-if scenario and cap the machine count to test running a routing's parallel paths at once.

August 5, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Boost a Work Center's Capacity in a Scenario in EDGEBIC

Use a work center capacity override slider in an EDGEBIC what-if scenario to simulate overtime or a de-rated machine and read the effect on lead time and cost.

August 5, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Change a Step's Time in a Scenario in EDGEBIC

Use a ModifyTime step override in an EDGEBIC what-if scenario to change a routing step's setup or process time and see the effect on lead time and cost.

August 5, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Copy Your Scheduler Display Settings in EDGEBIC

Export, import, and reset the EDGEBIC scheduler display configuration so a reinstall or a colleague's machine gets your tuned Gantt settings in one step.

August 5, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Extend Short Operation Bars on the Gantt in EDGEBIC

Set the Extend Op. if below Hours display option in EDGEBIC so short operations stay wide enough to click, without changing any schedule data.

August 5, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Include Sub-Assemblies in the Schedule in EDGEBIC

Turn the 'Include sub-assemblies in schedule' policy on or off in EDGEBIC to decide whether multi-level routings explode and schedule with their parent job.

August 5, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Reorder a Step in a Scenario in EDGEBIC

Use a Reorder step override in an EDGEBIC what-if scenario to move a routing step to a new sequence position and test the effect on lead time.

August 5, 20266 min read
Let's Solve Your Challenges Together