Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Factory workers in protective gear operating industrial machinery in a manufacturing plant
Production Scheduling

Shift Scheduling and Production Scheduling: The Link Most Planners Miss

How 2-shift vs. 3-shift decisions directly impact production schedule throughput. Learn available capacity math, bottleneck shift strategies, and when to add a shift vs. add equipment.

April 27, 202612 min read
Large manufacturing warehouse with organized shelves showing the scale of supply chain operations
Supply Chain

The Bullwhip Effect in Manufacturing: Why Small Demand Changes Wreck Your Supply Chain

Understand the bullwhip effect in manufacturing supply chains - why a 5% demand change becomes a 40% swing upstream, and how to dampen it with better scheduling.

April 27, 202612 min read
Warehouse workers processing shipments on a fulfillment line in a manufacturing facility
Manufacturing KPIs

Perfect Order Fulfillment: The Composite KPI That Drives B2B Customer Satisfaction

Perfect Order Fulfillment measures on-time, complete, undamaged, and correctly invoiced orders. Learn the formula, benchmarks, and how scheduling accuracy drives POF.

April 27, 202611 min read
Industrial factory interior with conveyor system showing production flow and work-in-process
Finite Capacity Planning

Queue Time: The Biggest Scheduling Lever You're Not Managing

In most job shops, queue time is 80-90% of total lead time. Learn how to manage queue time, apply Little's Law, and use finite capacity scheduling to cut it.

April 27, 202611 min read
Production planner reviewing a complex scheduling whiteboard calendar in manufacturing office
Production Scheduling

Schedule Nervousness: Why Your Planners Ignore the Production Schedule (And How to Fix It)

Schedule nervousness destroys planner trust and floor execution. Learn what causes it, how time fences fix it, and why a stable 90% schedule beats a volatile 100%-optimal one.

April 27, 202611 min read
Cost analysis graph showing manufacturing production expenses and sales trends
Manufacturing KPIs

Activity Based Costing in Manufacturing: A Practical Guide

Learn how activity based costing allocates overhead more accurately than traditional methods, and how scheduling data powers ABC in discrete manufacturing.

April 27, 20269 min read
Andon light system with yellow and red alert indicators above a manufacturing production line
Lean Manufacturing

Andon-Triggered Rescheduling: How Real-Time Machine Alerts Should Change Your Production Schedule

Andon alerts signal a production problem - but most plants stop at the alert. Learn the complete andon-to-reschedule workflow that protects delivery commitments when things go wrong.

April 27, 202612 min read
Glass bottle production line in a factory representing manufacturing output and order fulfillment
Production Scheduling

Backorders in Manufacturing: Causes, Customer Management, and How Finite Capacity Scheduling Prevents Accumulation

What causes backorders in manufacturing, how to manage customer backorder situations effectively, and how finite capacity scheduling stops backorder accumulation before it starts.

April 27, 202610 min read
Precision measurement caliper on an industrial surface representing manufacturing performance metrics
Buyer's Guide

What to Measure Before Buying Scheduling Software: Your Pre-Implementation Baseline

Learn the six key metrics to measure before implementing scheduling software so you can prove ROI, set targets, and report results to leadership with confidence.

April 27, 202611 min read
Production line in a manufacturing facility showing flow through multiple work centers
Finite Capacity Planning

Bottleneck Migration: What Happens to Your Schedule After You Solve the First Constraint

Solve your bottleneck and it moves. Learn how constraint migration works, how to predict where it shifts, and how to re-optimize your schedule after capacity changes.

April 27, 202612 min read
Manufacturing cell with multiple machines arranged in a U-shape layout on a factory floor
Lean Manufacturing

Cellular Manufacturing Scheduling: How Dedicated Cells Change Your Scheduling Approach

When you create manufacturing cells, the scheduling problem changes fundamentally. Learn how cell scheduling differs from functional layout and when to make a cell dedicated vs. shared.

April 27, 202611 min read
Carbon fiber composite layup and autoclave curing in aerospace manufacturing facility
Industry Solutions

Composite Manufacturing Scheduling: Cure Time Constraints, Autoclave Capacity, and Layup Sequencing

Composite manufacturing scheduling software that handles autoclave cure cycles, prepreg shelf life, layup sequencing, and NDT inspection holds for aerospace and automotive suppliers.

April 27, 202611 min read