Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC Platform
EDGEBIC Platform

How EDGEBIC Records Every Schedule Change

How EDGEBIC's schedule change history records every reschedule, work center swap, date override, and completion with who did it and why, for a full audit trail.

August 1, 20269 min read
Inventory & Planning
Inventory & Planning

How Forward Netting Connects a Producer to a Consumer in EDGEBIC

When one order builds a part and another consumes it in the same run, forward netting lets the consumer see the incoming supply. Here is how it prevents a double-build.

August 1, 20268 min read
Inventory & Planning
Inventory & Planning

How Lot Sizing and Yield Inflation Shape Order Quantities in EDGEBIC

EDGEBIC rounds a raw shortfall into a buildable quantity with lot-size rules and yield inflation. Here is how lot-for-lot, fixed-order-qty, and scrap allowance each work.

August 1, 20268 min read
Scheduling Concepts
Scheduling Concepts

How One Late Operation Ripples Through a Job

When one operation runs late, a finite capacity scheduler cascades the delay forward only: downstream steps shift, upstream and completed steps stay, and joins wait for the latest input.

August 1, 20268 min read
Inventory & Planning
Inventory & Planning

How Opening Balances Seed a New EDGEBIC Install

A new install starts with zero stock history. Here is how opening balances give each product its first honest on-hand and set the base every projection stands on.

August 1, 20268 min read
EDGEBIC How-To
EDGEBIC How-To

How to Add an ECN Number to a Product in EDGEBIC

How to record an engineering change notice number, notes, and manufacturer part details on a product in EDGEBIC for change-control traceability.

August 1, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Block a Time Window Across a Whole Shift in EDGEBIC

How to block a time window for every work center on a shift in EDGEBIC using a partial plant holiday, for an all-hands meeting or a plant-wide power interruption.

August 1, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Clear a Job's Schedule in EDGEBIC

How to wipe the plan for selected jobs in EDGEBIC with Clear Schedule, what it deletes, what it keeps, and the side effect on completed jobs to watch for.

August 1, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Close One Shift for a Holiday in EDGEBIC

How to close a single shift for a holiday in EDGEBIC using per-day capacity overrides, so the night crew gets a day off while the day shift keeps running normally.

August 1, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Find Scheduling Conflicts in the Gantt in EDGEBIC

How to spot over-allocated time slots in the Job View Gantt in EDGEBIC, where the conflict count appears, and why a clean scheduler run should show none.

August 1, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Mark a Job as Started in EDGEBIC

How to flag a manufacturing order as In Progress from the Orders grid in EDGEBIC, what that status does, and why it is not the same as logging actual hours.

August 1, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Rename a Work Center in EDGEBIC

How to rename a work center in EDGEBIC and update the routing steps that reference it, so the scheduler still matches the machine and does not leave steps with no resources.

August 1, 20266 min read
Let's Solve Your Challenges Together