- How to Clear a Job's Schedule in EDGEBIC
To clear a job's schedule in EDGEBIC by User Solutions, tick the job on the Orders grid and click Clear Schedule. That deletes the production schedule, operation, and resource rows for the selected jobs and marks each as not scheduled. The manufacturing orders and all master data stay, and the planner-entered start date is kept on purpose because it is an input, not a scheduling output.
Clearing a plan is not the same as deleting a job. It removes only what the scheduler produced, which makes it the right tool for two jobs: forcing a fresh routing read, and taking a cancelled job's bars off the board without losing the order.
Before You Start
- You know which jobs you want cleared. Selection scopes the action.
- You know the difference between scoped and full. No selection means a full wipe of all schedules.
- You know the start date survives. Clearing does not reset planner inputs.
Step 1: Open the Orders Grid
Open the Drive Schedule tab and go to the Orders grid.
Step 2: Select the Jobs to Clear
Tick the checkbox in the leftmost column for each job whose schedule you want removed.
This selection is what keeps the action scoped. If you leave every row unticked and click Clear Schedule, the action becomes a full wipe of all schedules in the plan, which is a different and much larger operation.
Step 3: Click Clear Schedule and Confirm
Click Clear Schedule. A scoped confirmation appears, naming the number of selected jobs. Read it to make sure the count matches what you intended, then click Yes.
The selected jobs' production schedule, operation, and resource rows are deleted, and each job's status returns to not scheduled.
Step 4: Rerun If You Cleared to Refresh a Routing
If the reason you cleared was to force a fresh routing read after a master-routing edit, run Schedule now. The next run reads the current routing for the cleared jobs and rebuilds their plan with the updated steps.
What Changes When You Save
| Surface | Effect |
|---|---|
| Production schedule, operation, resource rows | Deleted for the selected jobs |
| Manufacturing order | Kept; marked not scheduled |
| Start time and target start date | Preserved. They are planner inputs |
| Other jobs | Untouched when the action is scoped |
| A selected Completed job | Reopened to Scheduled; posted stock reversed auditably |
How to Check It Worked
- Confirm the cleared jobs show blank start and end dates on the Orders grid and read as not scheduled.
- Confirm their start time is still set, since that is a planner input the clear does not touch.
- On the Job View, confirm the cleared jobs have no bars while other jobs are unchanged.
- If you cleared to refresh a routing, rerun and confirm the new step durations appear.
Common Mistakes
Deselecting everything, then clicking Clear Schedule. With no selection, the action is a full wipe of the entire plan, not a scoped clear. Confirm the dialog names the number you expect.
Including a completed job by accident. A selected Completed job is reopened and its stock is reversed. That is correct, but only include it if you meant to.
Expecting the start date to reset. It does not. Start time and target start date are planner inputs and survive the clear. Change them in the order edit if you want them different.
Next
Clearing a job's schedule wipes only the scheduler's output and keeps your inputs, which is what makes it the right way to force a fresh routing read. To rerun without disturbing the rest of the shop, read how to reschedule safely. If you want the job gone entirely, read how to cancel a manufacturing order, and to understand why a saved routing sticks, how to work with frozen routings. More single-task recipes are in the EDGEBIC how-to hub, and the platform overview is at /edgebic.
Expert Q&A: Deep Dive
Q: I edited a routing but the job still schedules with the old steps. How do I make it pick up the change?
A: Clear that job's schedule, then rerun. A job that has its own saved routing snapshot keeps using it across reschedules, which is a deliberate stability feature, so a master-routing edit does not reach it automatically. Clearing the schedule drops the snapshot linkage and the next scheduling run reads the current routing again. Select just that job, click Clear Schedule, confirm the scoped dialog, then run Schedule and check that the new step durations appear on the Gantt.
Q: I selected a batch to clear and one of them was already completed. Anything to worry about?
A: Yes, watch that one. When a selected job is Completed, clearing its schedule also reopens it back to Scheduled and reverses any finished-goods stock it posted, through an auditable reversal entry rather than a silent delete. That is correct behavior, but it is a side effect you may not have intended if you only meant to clear the not-yet-run jobs. If you do not want a completed job reopened, do not include it in the selection.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.