Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Admin & Deployment
Admin & Deployment

Troubleshooting EDGEBIC Database Connections

When EDGEBIC will not connect to its database: the recovery window, the four fix actions, and the common causes for local and SQL Server setups.

August 5, 20267 min read
Admin & Deployment
Admin & Deployment

Upgrading EDGEBIC Safely

How to upgrade scheduling software without losing data: back up first, let the database update itself on first launch, and verify before the team logs in.

August 5, 20267 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a BOR Annotation in Routing? EDGEBIC Definition

A BOR annotation is a free-text sticky note attached to a step in the graphical routing designer. See how EDGEBIC lets planners leave shop-floor context on a routing without changing its logic.

August 5, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Forecast Type in Planning? EDGEBIC Definition

A forecast type labels a demand forecast as Sales, Production, or Consumption, telling the planning system what kind of expectation it represents. See how EDGEBIC uses each in projection.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Planned Start Pin in Scheduling? EDGEBIC Definition

A planned start pin is a durable intended start date for an operation that has not begun, without pretending it has. See how EDGEBIC schedules forward from a pin without writing actuals.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Secondary Resource in Manufacturing Scheduling? EDGEBIC Definition

A secondary resource is a second constraint, usually the operator, that must be free at the same time as the machine. See how EDGEBIC schedules people as finite resources alongside equipment.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Skill in Manufacturing Scheduling? EDGEBIC Definition

A skill is a named certification a routing step can require so only qualified operators are staffed on it. See how EDGEBIC turns the certificate on the wall into a schedulable constraint.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Working-Hour Tick in Optimization? EDGEBIC Definition

A working-hour tick is the optimizer's time unit, one hundredth of an hour, on a calendar with closed time cut out. See how EDGEBIC's exact solver measures the plant week without floating point.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is an Actuals Entry Source in Shop Floor Tracking? EDGEBIC Definition

An actuals entry source records where a logged actual came from: typed by a person, back-filled by the system, or imported. See how EDGEBIC flags system-filled hours so planners can trust the record.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is an End-Product Actuals Roll-Up in Manufacturing? EDGEBIC Definition

An end-product actuals roll-up aggregates a job's operational actuals against its single end product, the canonical how-far-along answer. See how EDGEBIC avoids double-counting sub-assemblies.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is an Operator Pin in Scheduling? EDGEBIC Definition

An operator pin hard-assigns a routing step to one named person, with no silent substitution. See how EDGEBIC makes a pinned step slide visibly instead of quietly swapping in someone else.

August 5, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Direction Precedence in Scheduling? EDGEBIC Definition

Direction precedence is the fixed order that decides which scheduling path a job takes: anchor, then actuals, then pins, then backward, then forward. See how EDGEBIC resolves it per order.

August 5, 20266 min read