Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Visual Scheduling
Visual Scheduling

How to Build a Routing as a Flow Chart in EDGEBIC

Build a manufacturing routing flow chart in EDGEBIC: drag work centers onto a canvas, connect steps with arrows, and schedule straight from the diagram.

July 23, 202611 min read
Troubleshooting
Troubleshooting

A Job Got Scheduled on a Holiday: Here's Why

A job scheduled on a holiday almost always means the calendar changed after the scheduling run. The four holiday layers, how to confirm, and the one-step fix.

July 23, 20266 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

JobBOSS Scheduling Gaps (And How Job Shops Fill Them)

JobBOSS finite capacity scheduling gaps explained: where ERP scheduling stops, why whiteboards take over, and how job shops add a real scheduling layer.

July 23, 202610 min read
Worked Examples
Worked Examples

Overlapping Operations with Lot Streaming: An EDGEBIC Example

A lot streaming production scheduling example: 1,000 pieces, cut then drill, and how a 100-piece transfer batch lets EDGEBIC save a full day of lead time.

July 23, 202612 min read
Worked Examples
Worked Examples

A Machine Breaks at 10 AM: Rescheduling Without Losing the Morning

How to reschedule production after machine breakdown: a walkthrough where logged work stays frozen, the down day is skipped, and the job still ships early.

July 23, 202610 min read
Worked Examples
Worked Examples

A Make-to-Stock Replenishment Cycle in EDGEBIC, Step by Step

Make to stock replenishment scheduling walkthrough: a safety-stock breach, a firmed build order, a 4.5-hour press run, and the receipt that restores stock.

July 23, 202611 min read
Worked Examples
Worked Examples

The Paint-Booth Math: Sequence-Dependent Changeovers in EDGEBIC

Sequence dependent setup time scheduling, worked in full: six paint jobs, one booth, and how EDGEBIC's setup matrix cuts changeover from 630 to 90 minutes.

July 23, 202612 min read
Worked Examples
Worked Examples

Half-Done Is Not Undone: Rescheduling Partially Completed Jobs in EDGEBIC

How to reschedule a partially completed production order: EDGEBIC locks 4 logged hours as history and forward-shifts the remaining 15.2, step by step.

July 23, 202611 min read
Worked Examples
Worked Examples

Quote to Ship in EDGEBIC: A Custom Order's Complete Journey

Follow the quote to ship manufacturing process end to end in EDGEBIC: simulation, pricing, conversion, scheduling, shop-floor actuals, and on-time proof.

July 23, 202611 min read
Visual Scheduling
Visual Scheduling

Reading the EDGEBIC Gantt: Planned vs Actual at a Glance

Read a planned vs actual Gantt chart in manufacturing: EDGEBIC keeps plan and real dates side by side, so every bar shows plan, reality, and progress.

July 23, 202610 min read
Troubleshooting
Troubleshooting

Idle Gaps in the Schedule: Waste or By Design?

Gaps in a production schedule can be queue buffers, shift boundaries, or real waste. How to tell intentional gaps from lost capacity, and what to do about each.

July 23, 20266 min read
Troubleshooting
Troubleshooting

Steps Scheduled Out of Sequence: Diagnosing Dependency Problems

Operations scheduled out of order have four causes: display sorting, intentional overlap, broken step links, or a real violation. How to tell them apart fast.

July 23, 20267 min read