Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Worked Examples
Worked Examples

Consume From Stock: How EDGEBIC Nets Demand Against Inventory

Inventory netting production scheduling walkthrough: three orders, 80 units on hand, and how EDGEBIC decides which jobs build and which consume stock.

July 23, 202611 min read
Visual Scheduling
Visual Scheduling

Drag-and-Drop Rescheduling in EDGEBIC: Modes, Rules, and Ripples

Drag and drop production rescheduling in EDGEBIC: three drag modes, staged saves, downstream flags, and a targeted re-plan that spares the rest of the plant.

July 23, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + Epicor: The Complete Scheduling Integration Guide

Epicor scheduling add-on integration with EDGEBIC explained: export items, routings, and orders, map columns once with import masks, schedule finite capacity, send dates back.

July 23, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + Fourth Shift: The Complete Scheduling Integration Guide

Fourth Shift scheduling integration with EDGEBIC: the vendor-recommended lineage, the 5-day Plastilite benchmark, and the import-mask steps to schedule from your data.

July 23, 20269 min read
Visual Scheduling
Visual Scheduling

The Safety Prompts That Keep Gantt Drags Honest in EDGEBIC

Prevent scheduling errors gantt drag mistakes cause: EDGEBIC's prior-operations prompt, target-date warnings, and hard validations keep manual moves honest.

July 23, 20269 min read
Visual Scheduling
Visual Scheduling

A Tour of the EDGEBIC Graphical Routing Designer

Tour the graphical routing editor in EDGEBIC: toolbox, canvas, properties panel, connector types, node tooltips, validation, and Excel export, panel by panel.

July 23, 202610 min read
Worked Examples
Worked Examples

From Empty Plant to First Schedule: An EDGEBIC Greenfield Walkthrough

Setting up scheduling software from scratch: follow one plant from an empty database to its first committed schedule in EDGEBIC, with every number shown.

July 23, 202611 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + JobBOSS: The Complete Scheduling Integration Guide

JobBOSS scheduling software integration with EDGEBIC, step by step: export jobs and routings, map columns once with import masks, and send finite capacity dates back.

July 23, 202610 min read
Visual Scheduling
Visual Scheduling

Editing a Live Job's Routing in EDGEBIC (Safely)

Edit routing on active production order safely: EDGEBIC freezes a per-job routing copy, so you change one live job deliberately and history stays intact.

July 23, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

How EDGEBIC Fills Epicor Kinetic's Scheduling Gaps

Epicor Kinetic scheduling gaps mapped to fixes: resource pools that re-shop, sequence-dependent setup optimization, and reschedules that never move completed work.

July 23, 20269 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

The 5-Day ERP Integration: The Fourth Shift Story Behind EDGEBIC's Approach

Fast ERP scheduling integration, proven: how a Fourth Shift ERP integration ran Monday to Friday at Plastilite, and how EDGEBIC's import masks industrialize that method.

July 23, 20269 min read
Visual Scheduling
Visual Scheduling

Making the Gantt Speak: Colors, Labels, and Layouts in EDGEBIC

Gantt chart color coding production teams actually read: EDGEBIC operation states, configurable bar captions with hour tokens, and self-saving layouts.

July 23, 20269 min read
Let's Solve Your Challenges Together