Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
Consume From Stock: How EDGEBIC Nets Demand Against Inventory
Inventory netting production scheduling walkthrough: three orders, 80 units on hand, and how EDGEBIC decides which jobs build and which consume stock.
Drag-and-Drop Rescheduling in EDGEBIC: Modes, Rules, and Ripples
Drag and drop production rescheduling in EDGEBIC: three drag modes, staged saves, downstream flags, and a targeted re-plan that spares the rest of the plant.
EDGEBIC + Epicor: The Complete Scheduling Integration Guide
Epicor scheduling add-on integration with EDGEBIC explained: export items, routings, and orders, map columns once with import masks, schedule finite capacity, send dates back.
EDGEBIC + Fourth Shift: The Complete Scheduling Integration Guide
Fourth Shift scheduling integration with EDGEBIC: the vendor-recommended lineage, the 5-day Plastilite benchmark, and the import-mask steps to schedule from your data.
The Safety Prompts That Keep Gantt Drags Honest in EDGEBIC
Prevent scheduling errors gantt drag mistakes cause: EDGEBIC's prior-operations prompt, target-date warnings, and hard validations keep manual moves honest.
A Tour of the EDGEBIC Graphical Routing Designer
Tour the graphical routing editor in EDGEBIC: toolbox, canvas, properties panel, connector types, node tooltips, validation, and Excel export, panel by panel.
From Empty Plant to First Schedule: An EDGEBIC Greenfield Walkthrough
Setting up scheduling software from scratch: follow one plant from an empty database to its first committed schedule in EDGEBIC, with every number shown.
EDGEBIC + JobBOSS: The Complete Scheduling Integration Guide
JobBOSS scheduling software integration with EDGEBIC, step by step: export jobs and routings, map columns once with import masks, and send finite capacity dates back.
Editing a Live Job's Routing in EDGEBIC (Safely)
Edit routing on active production order safely: EDGEBIC freezes a per-job routing copy, so you change one live job deliberately and history stays intact.
How EDGEBIC Fills Epicor Kinetic's Scheduling Gaps
Epicor Kinetic scheduling gaps mapped to fixes: resource pools that re-shop, sequence-dependent setup optimization, and reschedules that never move completed work.
The 5-Day ERP Integration: The Fourth Shift Story Behind EDGEBIC's Approach
Fast ERP scheduling integration, proven: how a Fourth Shift ERP integration ran Monday to Friday at Plastilite, and how EDGEBIC's import masks industrialize that method.
Making the Gantt Speak: Colors, Labels, and Layouts in EDGEBIC
Gantt chart color coding production teams actually read: EDGEBIC operation states, configurable bar captions with hour tokens, and self-saving layouts.
