Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Visual Scheduling
Visual Scheduling

Modeling Sub-Assemblies on the EDGEBIC Design Canvas

Sub assembly routing scheduling in EDGEBIC: connect a component with its own routing into a parent and the scheduler explodes and times every level.

July 23, 20269 min read
Worked Examples
Worked Examples

Scheduling Synchronized Multi-Spindle Operations in EDGEBIC

A synchronized machine scheduling walkthrough: three ganged drill heads start together, finish together, and mirror one parent schedule in EDGEBIC.

July 23, 202611 min read
Worked Examples
Worked Examples

Scheduling Around the Bottleneck: A TOC Anchor Example in EDGEBIC

A theory of constraints scheduling example: EDGEBIC pins a bottleneck CNC to a target date, schedules feeders backward and finishers forward.

July 23, 202612 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Setup Family? Taming the Changeover Matrix

A setup family groups products with identical changeover behavior, collapsing a 10,000-cell setup matrix to 64 cells. Definition, paint-shop math, and setup.

July 23, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Transfer Batch? Definition, Example, and Setup

What is a transfer batch? The number of pieces moved downstream at one time, letting the next operation start early. Definition, worked math, and setup guide.

July 23, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Work Center Group? Machine Pools Explained

A work center group is a machine pool: route a step to 'any mill' and the scheduler picks the best member each run, by speed, availability, or a set priority.

July 23, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is an Optimality Gap in Production Scheduling?

The optimality gap measures how far a schedule can possibly be from the best one: proven within X% of optimal. What the number means and how a solver earns it.

July 23, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

Attend Fraction Explained: One Operator, Seven Machines

Operator attend fraction defines how much human attention a machine-hour consumes: 0 for lights-out, 0.5 for one person tending two machines, 2.0 for a crew.

July 23, 20266 min read
Troubleshooting
Troubleshooting

Why Did My Job Jump 2 Days After a Reschedule?

Your job moved after a reschedule and the new end date looks wrong. Here are the four real causes, how to confirm which one you have, and the fix for each.

July 23, 20267 min read
Troubleshooting
Troubleshooting

Why the Optimizer Returned the Same Schedule (And When That's Correct)

A schedule optimizer showing no improvement is not always broken. The never-worse rule, locked jobs, and time budgets explain it, and each has a check.

July 23, 20267 min read
Troubleshooting
Troubleshooting

Work Center Showing Overload: Causes and Fixes

A work center overloaded beyond its capacity is either a data error, planned overtime, or synchronized parallel work. How to tell which, and the fix for each.

July 23, 20267 min read
Aerospace quality manager reviewing AS9100 compliant production schedule documentation
Compliance & Regulatory

AS9100 Scheduling Requirements: Aerospace Production Compliance

Guide to AS9100 Rev D scheduling requirements for aerospace manufacturers. Covers clause 8.1, operational planning, configuration management, and on-time delivery tracking.

May 18, 202610 min read
Let's Solve Your Challenges Together