Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
The Reports That Answer 'Are We On Time?' in EDGEBIC
An on time delivery report for manufacturing is three reports, not one: how EDGEBIC computes late jobs, SPI and CPI, and the on-time trend, with worked numbers.
The Settings That Change How Your Schedule Looks (and the Ones That Change the Plan)
Gantt display settings scheduling teams argue about: which options are cosmetic, which move real work, and the three places the line gets crossed.
TOC Buffers and Direction Precedence in EDGEBIC
How TOC buffer scheduling is sized in EDGEBIC, how backward and forward passes split around the anchor, and which direction wins when several rules could apply.
Eight User and Permission Mistakes in EDGEBIC (and How to Fix Them)
The user permission mistakes software admins repeat: shared logins, roles that never got the new rights, and a reset button that clears data. With fixes.
What a Scenario Can and Cannot Change in EDGEBIC
The documented scenario planning limits in manufacturing what-if analysis: which levers a scenario controls, which it never touches, and why.
What the EDGEBIC Schedule Checks Actually Look For
Schedule data quality checks in plain language: over-booking, machine collisions, off-calendar work, consistency drift, and the thresholds behind each finding.
Why Every EDGEBIC Column Carries Its Own Definition
A manufacturing report glossary that cannot drift: how EDGEBIC structures every column definition, validates their links, and what that buys you in an audit.
Routing Version Control for Manufacturing: Snapshot vs Live Routing
Routing version control in manufacturing: how a job's frozen copy is chosen over the live routing, the three authorized writes, and the hybrid merge rules.
Nine Work Center Configuration Mistakes and What They Look Like
Work center configuration mistakes are quiet: wrong instance counts, mixed machine pools, per-machine overrides, stale calendars. The symptom and fix for each.
Work Center Group Mistakes (And How to Spot Them)
The work center group mistakes that produce confusing schedules in EDGEBIC: wrong model, invented factors, deactivated pools, and the symptom for each.
Actual Dates Look Wrong: Tracing What the Shop Floor Really Reported
Actual dates wrong in production tracking? Auto-filled steps, end-of-day stamps, and mirrored parallel dates explain most cases. Trace each to its source.
A Work Center Shows Zero Capacity: The Checklist
Work center zero capacity is almost always configuration: instances, shifts, daily hours, calendars, or utilization. The six-point checklist that finds it fast.
