Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC Platform
EDGEBIC Platform

The Reports That Answer 'Are We On Time?' in EDGEBIC

An on time delivery report for manufacturing is three reports, not one: how EDGEBIC computes late jobs, SPI and CPI, and the on-time trend, with worked numbers.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

The Settings That Change How Your Schedule Looks (and the Ones That Change the Plan)

Gantt display settings scheduling teams argue about: which options are cosmetic, which move real work, and the three places the line gets crossed.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

TOC Buffers and Direction Precedence in EDGEBIC

How TOC buffer scheduling is sized in EDGEBIC, how backward and forward passes split around the anchor, and which direction wins when several rules could apply.

July 24, 202610 min read
Admin & Deployment
Admin & Deployment

Eight User and Permission Mistakes in EDGEBIC (and How to Fix Them)

The user permission mistakes software admins repeat: shared logins, roles that never got the new rights, and a reset button that clears data. With fixes.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

What a Scenario Can and Cannot Change in EDGEBIC

The documented scenario planning limits in manufacturing what-if analysis: which levers a scenario controls, which it never touches, and why.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

What the EDGEBIC Schedule Checks Actually Look For

Schedule data quality checks in plain language: over-booking, machine collisions, off-calendar work, consistency drift, and the thresholds behind each finding.

July 24, 202612 min read
EDGEBIC Platform
EDGEBIC Platform

Why Every EDGEBIC Column Carries Its Own Definition

A manufacturing report glossary that cannot drift: how EDGEBIC structures every column definition, validates their links, and what that buys you in an audit.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

Routing Version Control for Manufacturing: Snapshot vs Live Routing

Routing version control in manufacturing: how a job's frozen copy is chosen over the live routing, the three authorized writes, and the hybrid merge rules.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Nine Work Center Configuration Mistakes and What They Look Like

Work center configuration mistakes are quiet: wrong instance counts, mixed machine pools, per-machine overrides, stale calendars. The symptom and fix for each.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Work Center Group Mistakes (And How to Spot Them)

The work center group mistakes that produce confusing schedules in EDGEBIC: wrong model, invented factors, deactivated pools, and the symptom for each.

July 24, 20268 min read
Troubleshooting
Troubleshooting

Actual Dates Look Wrong: Tracing What the Shop Floor Really Reported

Actual dates wrong in production tracking? Auto-filled steps, end-of-day stamps, and mirrored parallel dates explain most cases. Trace each to its source.

July 23, 20267 min read
Troubleshooting
Troubleshooting

A Work Center Shows Zero Capacity: The Checklist

Work center zero capacity is almost always configuration: instances, shifts, daily hours, calendars, or utilization. The six-point checklist that finds it fast.

July 23, 20266 min read
Let's Solve Your Challenges Together