Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC Platform
EDGEBIC Platform

How to Set Up Products in EDGEBIC, Field by Field

Set up product master data the right way: every field on the EDGEBIC product form, the order to fill them in, categories, imports, and what saving changes.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

How to Set Up Shifts and Holidays in EDGEBIC, Step by Step

Set up shifts and holidays in the right order: build the weekly pattern, add whole-day and partial closures, then handle one-off days with capacity overrides.

July 24, 20268 min read
Admin & Deployment
Admin & Deployment

How to Set Up Users and Roles in EDGEBIC, Step by Step

Set up user permissions in manufacturing software without guesswork: create roles from the permission tree, add named users, force first-login password changes.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

How to Set Up Work Centers in EDGEBIC: A Field-by-Field Guide

How to set up work centers step by step: every field on the configuration dialog, what it changes, the shift calendar choice, and the per-day capacity override.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

How to Use Column Details in EDGEBIC

Report column definitions without a manual: how to open Column Details in any EDGEBIC report, read the formula and examples, and follow the see-also links.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

How to Set Up and Use the EDGEBIC Dashboard Tabs

Production dashboard setup in EDGEBIC: prerequisites, tile and threshold settings, the resource calendar controls, and opening a per-day capacity override.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

How to Work the MPS Grid in EDGEBIC, Bucket by Bucket

A step-by-step guide to the master production schedule grid in EDGEBIC: set up the product, read the columns, commit a build quantity, and firm it.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

How to Update the Routing on a Scheduled Job in EDGEBIC

Update routing on scheduled job safely: find the job's frozen copy, compare it to the master, pick one of three controls, then verify before the floor sees it.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

7 Ways Plants Ignore Schedule Warning Signs (and What It Costs)

Schedule warning signs manufacturing planners dismiss: unread diagnostics, filtered scans that hide findings, and settings switched off instead of data fixed.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

8 Data Import Mistakes That Cost Manufacturers a Week

Data import mistakes manufacturing teams repeat: unmapped required fields, missing unit conversions, split routing files, and zeros that overwrite good values.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

Inside an EDGEBIC Scheduling Run: The Phases of One Pass

How a scheduling engine works phase by phase: pre-flight validation, capacity rebuild, order sort, and the per-job pipeline that produces every date on the grid.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

Eight Instance and Utilization Mistakes That Produce Unhittable Plans

Machine utilization setting mistakes are silent: wrong instance counts, mixed pools, One Per Day on the wrong machine, headroom that lives nowhere. With fixes.

July 24, 20268 min read
Let's Solve Your Challenges Together