Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
How to Overlap Operations in EDGEBIC: A Field-by-Field Setup Guide
Overlap operations in production scheduling: which routing fields to fill for transfer batch size, flow lag hours, and transfer delay, and how to verify.
How to Read the Inventory Projection in EDGEBIC, Column by Column
Read the inventory projection with confidence: what every column on a projection row means, the six matrix lenses, and the drill-down that explains any cell.
How to Record Receipts, Issues and Adjustments in EDGEBIC
Record inventory transactions in manufacturing without breaking the audit trail: the panes, fields and sign conventions behind receipts, issues and counts.
How to Reschedule Production in EDGEBIC Without Breaking Anything
How to reschedule production safely: the pre-flight checks, the three scope options, the run itself, and the four-point verification that takes 30 seconds.
How to Run and Read an Optimization in EDGEBIC
Run the schedule optimizer in EDGEBIC step by step: pick a goal and budget, read the verdict, badge, KPI table, and move list, then Accept or Discard safely.
How to Run and Read the Schedule Anomaly Report in EDGEBIC
Run a schedule anomaly report in EDGEBIC: job filter versus plant-wide, reading severity chips, clicking through to the record, and a weekly triage routine.
How to Run, Filter and Export Reports in EDGEBIC
Export manufacturing reports to Excel and PDF from EDGEBIC: the date-range dialog, inline filters, persistent grid layouts, and the multi-sheet workbooks.
How to Run the Production Scheduler in EDGEBIC, Step by Step
Run the production scheduler in EDGEBIC: prerequisites, the Drive Schedule workflow, the confirm dialog, and how to read Item Start, Job End and Days Late.
How to Schedule a Job Backward From Its Due Date in EDGEBIC
Schedule backward from the due date: set the direction, use the cut off date, and handle the doesn't-fit popup with its editable dates and forward fallback.
How to Sequence Operations With Dependencies in EDGEBIC
Set up operation dependencies in a routing: next in sequence links, branching, joins, repeated work centers, and inserting a step into a live routing.
How to Set Queue, Flow, and Transit Times on an EDGEBIC Routing
Set queue time on a routing step by step: hours, transit days in calendar or working mode, transfer delay, and how to verify the result on the schedule.
How to Set Up Operators, Skills, and Rosters in EDGEBIC
Set up operator skills and rosters in EDGEBIC step by step: build the skills catalog, certify people with expiry dates, roster shifts, and gate a routing step.
