How to Record Receipts, Issues and Adjustments in EDGEBIC
To record inventory transactions in manufacturing without destroying the evidence, you post movements rather than edit balances. In EDGEBIC by User Solutions every receipt, issue and count correction becomes one permanent signed entry, and the on-hand figure is recalculated from those entries. This post covers where each action lives, which field takes which sign, and how to verify the result afterwards.
If the idea of an append-only stock record is new, read the inventory ledger explained first: it covers why the design works this way. What follows is the mechanics.
Where the Transaction Screens Live
Click Inventory in the left navigation. The view opens on the first product alphabetically with a fourteen-bucket horizon, and it holds five panes:
| Pane | What you do there |
|---|---|
| Calendar | Read the projected balance and available-to-promise rows, and firm replenishment suggestions |
| Forecast | Enter, edit and delete demand forecasts |
| Adjustments | Post manual receipts, issues and count corrections |
| Transaction History | Read every ledger entry for the selected product |
| On-Hand Matrix | See all stocked products as rows against date columns, and post movements by cell |
Above the panes sit a product dropdown, a Bucket picker (Day, Week or Period) and a Bucket Count spinner. Changing any of them re-runs the projection immediately.
Almost every transaction you post by hand happens in the Adjustments pane. The matrix gives you a second route when the date matters, which is covered further down.
Posting a Receipt
Use a receipt when physical stock arrives from outside the schedule: a purchase order landing, a customer return, product transferred in from another site.
- Select the product in the dropdown at the top of the Inventory view.
- Open the Adjustments pane.
- Enter the quantity received in Qty. It must be positive.
- Type a Comment that a stranger could understand six months from now. "PO 4471 receipt, 3 pallets" beats "stock in".
- Click Post Receipt.
A ledger entry is appended with a receipt type and a positive signed quantity. The on-hand figure recalculates from the full ledger sum in the same transaction, and every pane refreshes. If you enter zero or a negative number the post is rejected rather than reinterpreted.
Receipts also update the product's moving average cost using the standard weighted-average calculation, and the entry stores the unit cost that applied at that moment, so a valuation run months later still uses the right figures.
One receipt you never post by hand: the one from a completed make-to-stock build. That posts automatically when the order is marked complete, with the comment "Build to Inventory", and it commits in the same save as the status change. Posting it manually as well would double the quantity.
Posting an Issue
Use an issue when stock leaves for a reason the scheduler does not know about: a kit pulled to the floor outside a job, scrap disposal, a sample sent to a customer, a quality hold write-off.
- Inventory tab, select the product, open Adjustments.
- Enter the quantity consumed in Qty as a positive number.
- Add a comment naming the reason.
- Click Post Issue.
The service applies the negative sign for you. This is the single most common data-entry mistake in this screen: typing a negative quantity into an issue is rejected, because the direction is already carried by the action you chose.
As with receipts, the scheduler's own consumption is posted automatically. When it decides an order is covered by existing stock, it posts one issue with the comment "Schedule Transaction", pegged to that order. You never enter that by hand, and the arithmetic behind it is covered in how EDGEBIC nets demand against stock.
Posting a Cycle-Count Adjustment
Adjustments are the only movement where you enter a signed value, because the sign is the information.
- Inventory tab, select the product, open Adjustments.
- In Qty, enter the delta between the physical count and the system figure. Positive when the shelf holds more than the system thinks. Negative when it holds less.
- Comment with the count reference and date: "Cycle count 2026-06-13, bay A3".
- Click Post Adjustment.
A zero delta is rejected, because a zero-delta adjustment records nothing while implying something happened.
Adjustments are permanent. There is no delete and no edit. If you post the wrong figure, post an equal and opposite adjustment with a comment explaining it, and both rows stay on the record. That is the honest version of a correction, and it is what makes the ledger defensible during an audit. If cycle counting is new territory for your shop, cycle counting in manufacturing covers the counting discipline itself; this pane is where the result lands.
Posting From the Matrix When the Date Matters
The Adjustments pane stamps movements with the current date. When the planning date differs from the entry date, post from the matrix instead.
- Open the On-Hand Matrix pane.
- Set the Lens dropdown to OnHand.
- Find the product row and the date column you want.
- Double-click the cell. The movement dialog opens with the product name and date in its header.
- Choose Kind: Receipt, Issue or Adjustment.
- Enter the quantity (positive for receipt and issue, signed for adjustment) and an optional comment.
- Click OK.
For receipts and issues the column's bucket date becomes the entry's effective date, so the movement lands in the planning bucket you clicked. Adjustments are the exception: they always timestamp to the current moment regardless of the cell you opened, so use the Adjustments pane for those and treat the matrix route as a receipt and issue shortcut.
The matrix is also where you triage. The Lens dropdown switches every cell between projected on-hand, cumulative available-to-promise, net requirements, forecast, suggested replenishment and net ledger movement, and switching lenses re-pivots data already loaded rather than re-querying, so it is fast. The Find box filters rows by product name. Reading those lenses in detail is covered in how to read the projection.
Choosing the Right Movement Type
Three actions cover every manual movement, and picking the wrong one is not fatal (the balance ends up the same) but it does make the history harder to read later. Use this table when the choice is not obvious.
| Situation | Movement | Sign to enter |
|---|---|---|
| Purchase order arrives | Receipt | Positive |
| Customer returns good product | Receipt | Positive |
| Product transferred in from another site | Receipt | Positive |
| Kit pulled to the floor outside a job | Issue | Positive |
| Scrap disposal or quality write-off | Issue | Positive |
| Sample sent to a customer | Issue | Positive |
| Physical count higher than the system | Adjustment | Positive delta |
| Physical count lower than the system | Adjustment | Negative delta |
| Reconciling a cached quantity to the ledger | Adjustment | Signed difference |
The distinction that matters is between an issue and a negative adjustment. An issue says stock genuinely left for a known purpose. A negative adjustment says the stock was never there in the first place, or is no longer findable. Recording shrinkage as an issue makes your consumption figures look worse than reality and hides a counting problem inside a usage number.
Where Bin Location Comes From
Every entry is stamped with a bin location, taken from the product's default location at the moment of posting. Set that on the product editor, in the same inventory planning section as the build method and reorder settings, which is walked through in how to set a default bin location for a product. The default is a generic location, so a shop that never sets it will see the same string on every row, which is harmless.
Two things follow. Changing a product's default location does not rewrite existing entries, because entries are never rewritten. And the field is a product-level convenience rather than per-transaction bin control, so treat it as a label rather than a warehouse system.
Setting an Opening Balance for a New Product
When a product enters the system with stock already on the shelf, it needs a starting position. That is a distinct movement type, posted once per product at setup, and it is a service-level operation rather than a button on the Adjustments pane. Ask your administrator or implementation contact to run it as part of data load, alongside the item master import.
Two cautions. It is not a reset: calling it twice adds a second opening balance on top of the first rather than replacing it. And if you would rather stay in the UI, a plain receipt with the comment "Opening balance, count of 2026-07-01" achieves the same on-hand result with a slightly different entry type.
Verifying What You Posted
Never assume. The Transaction History pane lists every entry for the selected product with its type, signed quantity, comment, effective date and running balance. Three checks cover most doubts:
- Did the movement land? Find your entry at the top of the list and confirm the sign matches your intent.
- Does the balance agree? The running balance column carries the total forward entry by entry. The last row's balance is the authoritative on-hand.
- Did a job's receipt post? Filter to the job number and look for a receipt with the comment "Build to Inventory". Its absence on a completed make-to-stock order usually means the product's stocked flag is switched off.
That last symptom, along with the other misconfigurations that make posted movements go missing, is covered in inventory tracking mistakes.
A Sensible Daily Routine
Receiving posts arrivals as they land, with the purchase reference in the comment. The floor posts scrap and unplanned pulls the same day. Counts go in as signed adjustments with the count reference. Build receipts and schedule consumption post themselves, so nobody touches them.
Do that consistently and the projected balance calendar becomes worth reading, because its opening figure is the ledger sum. Everything in the inventory and planning guide stands on the quality of this one habit.
To see it running against your own part numbers and movement volumes, bring a stock export to a demo and ask User Solutions to load it. For the wider platform, see the complete guide to EDGEBIC.
Expert Q&A: Deep Dive
Q: Material physically arrived Friday but nobody entered it until Monday. Does it matter which date we use?
A: It matters to the projection, and there is a way to record both truths. Post the receipt from the inventory matrix rather than the calendar Adjustments pane: switch the lens to on-hand, double-click Friday's cell for that product, choose Receipt in the dialog, and enter the quantity. The bucket date from the column becomes the entry's effective date, so the receipt lands in Friday's planning bucket where it belongs, while the entry still records Monday as the moment it was posted. If you post from the Adjustments pane instead, the movement is stamped with the current date and shows up in Monday's bucket.
Q: A build order was marked complete twice by two different supervisors. Do we now have double the stock?
A: No. Completion posts its receipt through an idempotency guard: before writing, the system checks whether a live, non-reversed receipt already exists for that order, and skips the post if one does. The second click flips no quantities. If you want to confirm, open Transaction History for the product and filter to the job number: you should see exactly one entry with the comment Build to Inventory pegged to that order. If you see two, that is worth raising, because the guard is specifically designed to make it impossible.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How an Open EDGEBIC Screen Notices Someone Else's Edit
On a shared database, a change made on one workstation reaches every other open screen within a few seconds, without anybody pressing anything. How the change signal works and why your selection survives it.
What Changes When EDGEBIC Moves to a Shared Database
Moving EDGEBIC from one workstation to a shared SQL Server changes three assumptions at once: who may overwrite whom, how an open screen stays current, and who may run the scheduler.
What the EDGEBIC Refresh Button Actually Does
The refresh button forces a full re-read from the database, which is not the same as closing a screen and reopening it. Why the distinction matters on a shared database, and when to press it.