Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Print Shop Quoting: Turn a Job Around With a Real Press Schedule Behind It

Print shop quoting software simulates the job against your live press load, so a quick-turn quote carries a lead time and price the shop can actually hit.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Tool and Die Shops: Scheduling When Setup Runs the Job

Setup heavy scheduling for tool and die shops: price each machine's real changeover by sequence so plans stop assuming an average that is wrong in both directions.

July 30, 202610 min read
Scheduling Concepts
Scheduling Concepts

How EDGEBIC Switches Between Finite and Infinite Capacity

Where EDGEBIC by User Solutions runs finite, where it runs infinite, and the three settings that move a job between them, with worked numbers.

July 30, 20269 min read
Scheduling Concepts
Scheduling Concepts

Forward Scheduling vs the Critical Path Method

Forward scheduling vs the critical path method: CPM finds the longest dependency chain assuming infinite resources, forward scheduling places that chain against finite capacity.

July 30, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Setup Families Cut a Combinatorial Problem Down

How setup families reduce scheduling complexity: grouping products collapses a product-by-product changeover matrix from thousands of cells to dozens, with the scale math.

July 30, 20268 min read
Scheduling Concepts
Scheduling Concepts

Lead Time as the Sum of Its Parts

Lead time as the sum of its parts: setup, run, queue, move, and transit each add up, and queue usually dominates, so knowing the breakdown tells you where to cut.

July 30, 20268 min read
Scheduling Concepts
Scheduling Concepts

One Big Machine vs Several Small Ones: A Scheduling View

One big machine vs several small ones: the same total capacity behaves differently under load, because parallel instances cut queue time and survive a breakdown, with numbers.

July 30, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are BOR Status Buckets? EDGEBIC Definition

BOR status buckets classify every product as Has BOR, No BOR, or Multiple BORs. See how EDGEBIC uses them to show which products can be scheduled.

July 30, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Backward-Infeasible Job in Scheduling?

A backward-infeasible job is a just-in-time order that cannot fit before its due date, so the engine rolls the whole job back and forward-schedules it, then flags it for the planner.

July 30, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Build Method in Manufacturing?

A build method is a product's default planning policy: make to order, make to stock, or make to stock with a per-order override. Here is how each behaves.

July 30, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Connection String?

A connection string is the set of details that tells EDGEBIC how to reach its database: server, database name, and sign-in method. Learn how it is built and protected.

July 30, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Conversion Factor in Data Import?

A conversion factor is a multiplier applied to a numeric column during import, so a file in minutes lands as hours. Learn how EDGEBIC applies it before saving.

July 30, 20265 min read
Let's Solve Your Challenges Together