Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Long-Lead Assemblies: Scheduling Around the Casting That Takes 12 Weeks

Long lead assembly scheduling for heavy equipment: pull the build to finish just in time, reserve the delivery tail, and time the work around a casting that arrives weeks out.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Heavy Equipment: Scheduling One Job Across Two Plants

Heavy equipment multi plant scheduling done right: model the days a weldment spends in transit between facilities so downstream steps start when the parts actually arrive.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

High-Mix Low-Volume: Scheduling Hundreds of Small Jobs

High mix low volume scheduling that holds together: pool flexible machines, price sequence-dependent setups, and load hundreds of small jobs against one finite plan.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Job Shop Mixed-Priority Scheduling: Rush, Standard, and Stock in One Plan

Job shop mixed-priority scheduling sequences rush, standard, and stock orders by priority then due date, and can search job orderings for a provably better plan.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Li-Ion Battery: Scheduling Coating and Other Continuous Lines

Li-ion battery continuous process scheduling: mark coating and drying lines as continuous, use a start-to-start lag so downstream overlaps, and compress electrode makespan.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Li-Ion Battery: Planning Around Yield and Scrap Honestly

Li-ion battery yield scrap planning: how a planner sizes a job so good cell output meets demand, and where the yield field belongs in replenishment rather than the scheduler.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Machine Shop Multi-Shift Scheduling: One Job Across Day and Night

Machine shop multi-shift scheduling lets a single job span day and night shifts and multiple machines, so a 28-hour part finishes in a day, not a guess.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Make-to-Order Shops: Scheduling Backward From the Due Date

Make to order backward scheduling: pull each job to finish just in time, cut work in process, and get told before you promise when a due date simply will not fit.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Medical Device Scheduling: Planning on Operator Hours, Not Just Head Count

Medical device operator hours scheduling tracks a per-person hours ledger, so a plan books only the certified-operator time you have and slides work when it runs out.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Metal Fabrication Quoting: Promise Dates From a Real Capacity Simulation

Metal fabrication quoting software simulates the job against live shop capacity, so a fab shop quotes lead time and cost from a real schedule, not a gut feel.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Packaging Lines: Scheduling Machines That Must Run in Lockstep

Packaging multi-machine line scheduling runs filler, capper, and labeler in synchronized lockstep, or splits a job across duplicate lines to finish in half the time.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Plastics Scheduling: Modeling Mold Cavities and Pieces-Based Capacity

Plastics cavity capacity scheduling models a multi-cavity mold as machine instances and schedules by pieces per hour, so the plan matches real molding throughput.

July 30, 202610 min read