Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
Closing the Loop from Shop Floor to Plan in EDGEBIC
A schedule is only alive if reality flows back into it. Trace the full loop in EDGEBIC: operator punch, daily actuals, reschedule, and a fresh dispatch list.
Comparing Routing Options for a Quote in EDGEBIC
Build named scenarios to compare routing options for a quote in EDGEBIC: second shift, outside vendor, weekend push. Line up lead time and cost, then pick with numbers.
Determinism and Reproducibility in Schedule Optimization
The EDGEBIC optimizer is deterministic: the same inputs and the same seed produce the identical plan every time. Here is why that matters for trust, audits, and support cases.
E2 Shoptech Scheduling Gaps (And How EDGEBIC Fills Them)
E2 Shoptech finite capacity scheduling gaps that shops report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, and slow what-if answers.
E2 Shoptech to EDGEBIC: The Data Mapping Reference
E2 Shoptech data export scheduling field by field: map parts, work centers, routings, jobs and hours into EDGEBIC masks, with conversions and upsert rules.
EDGEBIC + E2 Shoptech: The Complete Scheduling Integration Guide
E2 Shoptech production scheduling integration with EDGEBIC step by step: export parts, work centers, routings and jobs, map columns once, schedule at finite capacity.
EDGEBIC + IQMS / DELMIAworks: The Complete Scheduling Integration Guide
IQMS DELMIAworks production scheduling integration with EDGEBIC step by step: export items, work centers, routings and orders, map columns once, schedule at finite capacity.
EDGEBIC + Plex: The Complete Scheduling Integration Guide
Plex production scheduling integration with EDGEBIC step by step: export items, work centers, routings and orders, map columns once, schedule at finite capacity.
EDGEBIC + ProShop: The Complete Scheduling Integration Guide
ProShop production scheduling integration with EDGEBIC step by step: export parts, work centers, routings and orders, map columns once, schedule at finite capacity.
From Excel and RMX to EDGEBIC: The Growth Path
Outgrown scheduling in Excel or Resource Manager for Excel? EDGEBIC imports the spreadsheets you already keep, so the move up is your data mapped once, not a rebuild.
How a Proven Optimality Gap Builds Trust in a Schedule
A proven optimality gap tells you how close a production schedule sits to the mathematical best. Here is how EDGEBIC computes it and why it ends the 'could we do better' debate.
How a Quote Becomes an Order in EDGEBIC (Without Re-Keying)
One click converts an approved quote into a Manufacturing Order in EDGEBIC. See exactly what carries forward, why nothing is re-typed, and how conversion is guarded.
