Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Schedule Optimization
Schedule Optimization

Staleness Protection in the Optimizer

If the schedule changes while an optimizer proposal is open, Accept refuses to overwrite it. Here is how the snapshot stamp catches drift and protects your data from a stale apply.

August 2, 20267 min read
Worked Examples
Worked Examples

Standing Up the Kiosk and Logging a First Shift in EDGEBIC

A shop-floor kiosk walkthrough: bring a terminal online, run one operation from setup to complete, count pieces, and hand off the shift with real actuals.

August 2, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

SYSPRO to EDGEBIC: The Data Mapping Reference

SYSPRO data export scheduling field by field: map stock codes, work centers, BOM operations, WIP jobs and labor into EDGEBIC masks with load order and upsert rules.

August 2, 202611 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Syteline to EDGEBIC: The Data Mapping Reference

Syteline data export scheduling field by field: map items, resources, routings and job orders into EDGEBIC masks, with conversions and upsert rules.

August 2, 202610 min read
Troubleshooting
Troubleshooting

The Anomaly Report Flags a Job I Think Is Fine

Not every anomaly row is a defect. Warning-level checks flag normal schedule texture, some findings are advisory, and stale data can flag a job already fixed. Here is how to tell a false alarm from a real one.

August 2, 20267 min read
Outcomes & ROI
Outcomes & ROI

The Cash Conversion Benefit of Shorter Lead Times

Shorter lead times shorten the gap between spending on material and collecting on the invoice. That freed cash is working capital scheduling returns without a loan.

August 2, 202610 min read
Outcomes & ROI
Outcomes & ROI

The Compounding Return on Delivery Reliability

On-time delivery is not a one-time win. Each reliable ship feeds the next: less expediting, more stable plans, calmer capacity, and reliability that reinforces itself.

August 2, 202610 min read
Admin & Deployment
Admin & Deployment

The Data-Import Governance Workflow in EDGEBIC

The data-import governance workflow in EDGEBIC: who owns the masks, how dry runs and result outcomes keep loads safe, and the review discipline that protects the schedule.

August 2, 20268 min read
Schedule Optimization
Schedule Optimization

The On-Time Job Count Metric in Optimization

On-time job count is the plainest optimizer measure: how many jobs land by their due date. Here is how EDGEBIC computes it, how it breaks ties, and why it complements weighted tardiness.

August 2, 20267 min read
Schedule Optimization
Schedule Optimization

The Optimizer Explain Dialog and Audit Trail

The Explain dialog tells the plain-language story of an optimization, and Accept saves that exact story to the audit log. Here is what each records and why they match.

August 2, 20267 min read
Inventory & Planning
Inventory & Planning

The Per-Order Build-to-Inventory Override in EDGEBIC

How a single manufacturing order can override a product's make-to-stock or make-to-order policy in EDGEBIC, and how the hybrid build method lets exceptions ride on top of a default.

August 2, 20267 min read
Outcomes & ROI
Outcomes & ROI

The Quality Dividend of a Realistic Production Load

An overloaded schedule pushes operators to double up, skip steps, and rush, and each of those makes defects. A load that fits the shift is a quieter, cleaner floor.

August 2, 202610 min read