Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Shop Floor Execution
Shop Floor Execution

Reassigning an Operator With a Replacement Drag in EDGEBIC

On the Operator-view Gantt, dragging a bar between lanes reassigns the operation to another qualified person. Learn what the drag checks and what it deliberately does not.

August 2, 20267 min read
Scheduling Concepts
Scheduling Concepts

Released vs Unreleased Jobs in Scheduling

A released job is authorized and ready to hit the floor; an unreleased job is planned but held back. See the difference, why it controls work-in-process, and how to manage it.

August 2, 20268 min read
Inventory & Planning
Inventory & Planning

Reorder Point and Safety Stock: Two Lines, Two Jobs in EDGEBIC

In EDGEBIC a reorder point and safety stock are separate levels with different jobs. Learn why the reorder point sits above safety, and how the gap between them covers lead time.

August 2, 20267 min read
Scheduling Concepts
Scheduling Concepts

Rough-Cut vs Detailed Capacity Planning

Rough-cut capacity planning checks a few key resources against aggregate demand; detailed capacity planning schedules every operation finitely. Compare the two with worked numbers.

August 2, 20268 min read
Worked Examples
Worked Examples

Routing a Job to a Backup Machine When the Primary Is Full in EDGEBIC

A true-alternative walkthrough: set a fallback work center, watch the engine route overflow to it automatically, and keep a started job on its original machine.

August 2, 202610 min read
Worked Examples
Worked Examples

Running a Dedicated Oven Day: One Job Per Chamber in EDGEBIC

A OnePerDay walkthrough: schedule a batch furnace so each chamber runs a single job per day, three chambers hold three jobs, and a fourth waits.

August 2, 202610 min read
Inventory & Planning
Inventory & Planning

Sales, Production, and Consumption: The Three Forecast Types in EDGEBIC

How the Sales, Production, and Consumption forecast types add together in EDGEBIC, why the type is part of the identity key, and how each feeds gross requirements.

August 2, 20267 min read
Worked Examples
Worked Examples

Scheduling a Five-Job Week With Mixed Priorities in EDGEBIC

A production scheduling walkthrough: load five jobs with different priorities and due dates, run the scheduler, and read how the engine sequences competing work.

August 2, 202611 min read
Schedule Optimization
Schedule Optimization

Setting the Optimizer Time Budget

The optimizer runs on a time budget of 10, 30, or 60 seconds. Here is how the budget shapes the search, what an interrupt returns, and how to pick the right one for the run.

August 2, 20267 min read
Shop Floor Execution
Shop Floor Execution

Setting Up the EDGEBIC Kiosk for Your First Shift

Bind a kiosk terminal to a work center and machine, remember the selection, and start punching. A step-by-step guide to standing up the shop-floor kiosk.

August 2, 20267 min read
Scheduling Concepts
Scheduling Concepts

Slack-Based Job Sequencing

Slack-based job sequencing runs the job with the least slack first, where slack is time until due date minus work remaining. See the minimum-slack rule with worked numbers.

August 2, 20268 min read
Worked Examples
Worked Examples

Splitting a Large Order Across Parallel Work Centers in EDGEBIC

A parallel scheduling walkthrough: run one big job on two machines at once, split the hours with load balancing, and finish in roughly half the time.

August 2, 202610 min read
Let's Solve Your Challenges Together