Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Schedule Optimization
Schedule Optimization

How the Optimizer Preserves Completed and Started Work

The optimizer never moves work that is already done. Completed rows pass through optimize and Accept byte-identical, using the same actuals-preservation machinery as any reschedule.

August 2, 20267 min read
Schedule Optimization
Schedule Optimization

How the Optimizer Scores a Schedule

One calculator produces every optimizer number: weighted tardiness, late jobs, makespan, setup, and instability. Here is how EDGEBIC scores a plan so the comparison you read is the math it chose by.

August 2, 20267 min read
Shop Floor Execution
Shop Floor Execution

How the Shift Operator Roster Works in EDGEBIC

The roster is a weekly shift-by-weekday pattern that says who works which shift. Learn how it keys to global shifts and why parentless custom shifts can never be staffed.

August 2, 20267 min read
Admin & Deployment
Admin & Deployment

Keeping the EDGEBIC Database Healthy Over Time

Keeping the EDGEBIC database healthy over time: the backup habit, safe data clearing, log hygiene, and the recovery path so a scheduling database stays dependable for years.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Load Leveling Across a Planning Week

Load leveling smooths the peaks and valleys of work across a week so no single day is overloaded. See how a finite scheduler spreads load forward, with worked numbers.

August 2, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Made2Manage to EDGEBIC: The Data Mapping Reference

Made2Manage data export scheduling field by field: map items, work centers, routings, jobs and labor into EDGEBIC masks, with load order and upsert rules.

August 2, 202611 min read
Shop Floor Execution
Shop Floor Execution

Marking a Job Complete From the Floor in EDGEBIC

Tapping Complete Operation closes the punch, rolls up the day's hours, and stamps the actual end. See the end-of-day snap that keeps same-day completions valid.

August 2, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

MIE Trak Pro to EDGEBIC: The Data Mapping Reference

MIE Trak Pro data export scheduling field by field: map parts, work centers, routers, work orders and labor into EDGEBIC masks with load order and upsert rules.

August 2, 202611 min read
Inventory & Planning
Inventory & Planning

Min-Max vs Reorder-Point Replenishment

Min-max vs reorder-point replenishment compared: how each method decides when to reorder and how much, when to use one over the other, and how a projection reads either.

August 2, 20268 min read
Schedule Optimization
Schedule Optimization

Minimizing Weighted Tardiness With the Optimizer

Weighted tardiness is the optimizer's core delivery measure: total lateness scaled by job priority. Here is how it is computed, why it leads most goals, and how to read it.

August 2, 20267 min read
Worked Examples
Worked Examples

Running a Month-End Capacity Review in EDGEBIC

A capacity review walkthrough: read the Work Center Utilization report end to end, find the overloaded and idle machines, and turn the numbers into a plan.

August 2, 202610 min read
Troubleshooting
Troubleshooting

My Forecast and a Firm Order Were Both Counted

When a forecast quantity and a firm order for the same period both show up as demand, the forecast consumption rule is what nets them together. Here is how consumption works and how to configure it.

August 2, 20266 min read
Let's Solve Your Challenges Together