Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Scheduling Concepts
Scheduling Concepts

Why the Continuous-Process Flag Lives on the Machine

Why the continuous-process setting is a property of the work center, not the routing, how it selects the lot-streaming model, and the anomaly that flags a model mismatch.

August 4, 20268 min read
Schedule Optimization
Schedule Optimization

Why the Optimizer Treats Due Dates as Soft Targets

The EDGEBIC optimizer models due dates as strongly weighted targets, not hard walls, so it always returns the best achievable plan even when some dates cannot be met.

August 4, 20268 min read
Upgrade & Comparison
Upgrade & Comparison

A Phased Migration Plan to EDGEBIC

A phased migration to EDGEBIC moves one cell at a time while RMDB stays the system of record. Import, verify, pilot, and widen, so risk stays contained and no cutover is ever forced.

August 3, 20268 min read
Upgrade & Comparison
Upgrade & Comparison

An EDGEBIC Migration Checklist

A practical EDGEBIC migration checklist: clean data, build masks, import in dependency order, verify capacity, run a pilot, and expand. RMDB stays supported, so you move at your own pace.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

Auto Re-Sequencing: Closing the Gap After a Gantt Drag in EDGEBIC

Auto re-sequencing in EDGEBIC pushes later operations on the same machine forward after you drag a bar, so the queue stays tight, with every pushed operation staged in the same pending set.

August 3, 20267 min read
Upgrade & Comparison
Upgrade & Comparison

Cleaning Your Data Before Importing to EDGEBIC

Clean your data before importing to EDGEBIC and the migration goes smoothly: fix name drift, fill required fields, and reconcile capacity, because the import surfaces every gap as a broken link or a wrong date.

August 3, 20267 min read
Upgrade & Comparison
Upgrade & Comparison

Completing the Cutover to EDGEBIC

Complete the cutover to EDGEBIC on the trust signal, not a deadline: let short jobs drain on RMDB, import new work clean, and make EDGEBIC the system of record when it has earned it.

August 3, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + ERPNext: The Complete Scheduling Integration Guide

ERPNext production scheduling integration with EDGEBIC: export items, workstations, operations and work orders, map columns once, schedule at finite capacity.

August 3, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Balancing Appliance Assembly Lines With Machine Pools

Appliance manufacturing scheduling that pools interchangeable assembly lines into a group, so a model routes to a capability and lands on whichever line frees up first.

August 3, 20267 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Line Scheduling for Automotive Parts Suppliers

Automotive parts scheduling software that splits high-volume jobs across parallel lines and overlaps operations with transfer batches, so tier delivery windows hold without excess WIP.

August 3, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Composites Scheduling Around Autoclave Cure Cycles

Composites manufacturing scheduling that models an autoclave as one cure load per cycle, pools interchangeable ovens, and gates layup by operator skill so the cure calendar stays real.

August 3, 20267 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Machine Pools for Fastener and Cold Heading Shops

Fastener manufacturing scheduling that pools cold headers and thread rollers, picks the member by a selection strategy, and books slower machines longer by their efficiency factor.

August 3, 20267 min read
Let's Solve Your Challenges Together