Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Importing Sub-Assembly Routings From Your ERP

How to bring multi-level BOM and sub-assembly routings out of your ERP into EDGEBIC: one routing per level, how a child feeds its parent, and the import order that wires them.

August 7, 20268 min read
Schedule Optimization
Schedule Optimization

Job Priorities Versus the Schedule Optimizer

Good priorities set the queue, but no fixed priority order fixes every interleaving problem. Here is what each tool does and why you still need both.

August 7, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Keeping Job Numbers Aligned Between Your ERP and EDGEBIC

How to keep work order and job identifiers consistent across your ERP and EDGEBIC: natural keys, order references, multi-line auto-numbering, and what breaks when they drift.

August 7, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Mapping Alternate Work Centers From Your ERP

How to carry an ERP's alternate machine data into EDGEBIC: what a true alternate means, speed factors, priority, machine pools, and what to do when the ERP holds nothing at all.

August 7, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Mapping Your ERP's Units of Measure for Scheduling

How to reconcile ERP units of measure with EDGEBIC when you import: quantity units, time units, per-hundred standards, and the conversion factors that keep dates honest.

August 7, 20268 min read
Schedule Optimization
Schedule Optimization

Optimizer Messages and What They Mean

Every message the optimizer shows has a specific cause and a specific fix. Here is the full list, from no open orders to a missing goal to a stale proposal banner.

August 7, 20267 min read
Shop Floor Execution
Shop Floor Execution

Planned Crew Versus Who Actually Worked in EDGEBIC

The schedule books operator hours in advance and the kiosk records who really ran the job. Learn why EDGEBIC keeps those two records apart and which one to report on.

August 7, 20267 min read
Shop Floor Execution
Shop Floor Execution

Rolling a Job's Actuals Up to the End Product in EDGEBIC

Actuals are captured per operation, but planners ask about the job. See how EDGEBIC rolls operation actuals into one end-product view and when a job counts as complete.

August 7, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Splitting One ERP Operation Into Multiple EDGEBIC Steps

How to break a single coarse ERP operation into separate EDGEBIC routing steps when work runs across different machines, so finite capacity scheduling sees the real flow.

August 7, 20268 min read
Shop Floor Execution
Shop Floor Execution

The Auto-Filled Actuals Badge Explained in EDGEBIC

Some actuals are typed by a person and some are filled in by the system. See how the auto-filled badge tells them apart and why that provenance protects your numbers.

August 7, 20267 min read
Schedule Optimization
Schedule Optimization

The Makespan Metric in Schedule Optimization

Makespan measures the span from the first start to the last end of your whole plan. Here is how the optimizer calculates it, when to chase it, and when to ignore it.

August 7, 20268 min read
Shop Floor Execution
Shop Floor Execution

Preventive Maintenance and the EDGEBIC Kiosk: What Operators Actually See

The EDGEBIC kiosk shows one banner, and it is not a maintenance banner. See what the kiosk really warns about and how to protect service hours with a per-day capacity override.

August 7, 20266 min read
Let's Solve Your Challenges Together