Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC How-To
EDGEBIC How-To

How to Export a Report to PDF in EDGEBIC

Produce a PDF of any EDGEBIC report for archiving, customer delivery, or a management pack, and set up the grid correctly before you export so the file reads well.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Export the Gantt Chart as an Image in EDGEBIC

Capture the EDGEBIC Gantt as a PNG for a meeting, a shop floor print, or a customer update, and set the visible date range correctly before you export.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Export the Setup Matrix to CSV in EDGEBIC

Export a work center's full changeover matrix from EDGEBIC to CSV for review, sign-off, or archiving, including both family-level rows and product-level overrides.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Filter a Report With the Filter Editor in EDGEBIC

Build multi-condition filters on any EDGEBIC report grid, combine conditions with and or or, read the active filter panel, and clear a filter when you are done.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Fix a Circular Dependency in a Routing in EDGEBIC

A circular dependency stops a routing from scheduling at all. How to find the loop in your step links in EDGEBIC, break it safely, and confirm the fix.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Give One User Extra Access in EDGEBIC

EDGEBIC permissions come only from roles, so there is no per-user override screen. How to build a narrow role for a single person, assign it alongside their existing one, and remove it later.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Group a Report Grid by a Column in EDGEBIC

Turn a flat EDGEBIC report into a summarized view by grouping on work center, customer, or date, including multi-level grouping and what happens on export.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Review the Security Audit Trail in EDGEBIC

EDGEBIC records security events in an append-only trail inside the database. There is no viewing screen, so here is how to request an extract and which reports answer schedule questions.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Run the Pre-Flight Check Before Scheduling in EDGEBIC

EDGEBIC validates master data before the scheduling engine runs: how the pre-flight check works, what it inspects, and how to clear every row it flags.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set the Priority of Alternate Work Centers in EDGEBIC

Priority decides which alternate machine EDGEBIC prefers when two can finish a step at the same time. How to set it, and why the fastest machine still wins.

August 7, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Temporarily Disable a Parallel Work Center in EDGEBIC

Take one machine out of a parallel group in EDGEBIC without deleting its configuration, using the active flag on the alternative work center row, and put it back later.

August 7, 20266 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Importing ERP Labor Transactions as Scheduling Actuals

How to turn your ERP's labor transactions into EDGEBIC actuals: which columns to export, how hours attach to a job and work center, and what a reschedule does with them.

August 7, 20268 min read
Let's Solve Your Challenges Together