Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC How-To
EDGEBIC How-To

How to Remove a Setup Matrix Entry in EDGEBIC

Remove a setup matrix entry in EDGEBIC and know exactly what the scheduler charges instead, so deleting one wrong changeover cell does not quietly cost hours.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Rename a Product in EDGEBIC

Rename a product in EDGEBIC and answer the update related references prompt correctly, so routings, the Gantt, and work center views all show the new name.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Scope a Utilization Report to a List of Jobs in EDGEBIC

Enter several job numbers separated by commas in the EDGEBIC work center utilization report to see how much of each station's load belongs to one customer or program.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to See Which Jobs Are Behind a Capacity Number in EDGEBIC

Click an assigned hours or backlog cell in the EDGEBIC Resource Calendar to open the Job Detail list and see the exact jobs, shifts, and hours behind that number.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Tidy Up the Routing Diagram Layout in EDGEBIC

Tidy up the routing diagram layout in EDGEBIC: arrange nodes, use zoom and fit to window, and save positions so the drawing opens the same way every time.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Un-Start an Operation in EDGEBIC

Clear the actual start date on an EDGEBIC operation so it returns to not started, becomes free for the scheduler to re-plan, and stops reporting progress it never made.

August 9, 20266 min read
Outcomes & ROI
Outcomes & ROI

How Variance Data Fixes the Routing That Was Always Wrong

Some routings have been wrong for years and nobody could prove it. See how planned versus actual variance finds them, with worked hours and the honest limits.

August 9, 20267 min read
Troubleshooting
Troubleshooting

I Cannot Copy the Scheduling Failure Details: Causes and Fixes

When the copy button on the scheduling failure dialog produces nothing, another application usually holds the clipboard. How to retry and what to capture instead.

August 9, 20266 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Importing Customer Due Dates vs Internal Need Dates

Your ERP holds several dates per work order. Learn which one to map as the EDGEBIC due date, which to map as the job start, and why importing an MRP need date double-buffers the plan.

August 9, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Importing Your ERP's Operation Sequence Numbers Into EDGEBIC

How EDGEBIC uses ERP operation sequence numbers to wire a routing chain on import, and how to handle duplicates, alphanumeric codes, sub-operations, and renumbered steps.

August 9, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Should You Import Your ERP's Manufacturing Calendar?

What an ERP calendar actually gives a scheduler, why shift patterns have to be authored rather than imported, and how to harvest the holiday closure list your ERP already maintains.

August 9, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Mapping ERP Order Priority Into Your Schedule

How to translate an ERP's priority codes, customer classes, and rank numbers into EDGEBIC job priority, and why priority ranks the queue rather than overriding finite capacity.

August 9, 20268 min read
Let's Solve Your Challenges Together