Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Industrial machinery on a factory floor representing equipment performance measurement
Glossary

What Is TEEP (Total Effective Equipment Performance)? Definition, Formula, and Examples

Learn what TEEP means in manufacturing, how to calculate it using the OEE × Loading formula, and why world-class plants target 85%+ TEEP.

April 27, 20265 min read
Warehouse worker scanning inventory items with a handheld barcode scanner and tablet
Supply Chain

Inventory Cycle Counting: How It Works and Why It Beats the Annual Stocktake

Inventory cycle counting improves record accuracy, reduces disruption, and feeds better data into MRP and production scheduling. Learn the process, methods, and best practices.

April 27, 20269 min read
Industrial worker operating precision lathe in a job shop manufacturing environment
Manufacturing KPIs

Job Costing in Manufacturing: Track Costs by Work Order and Improve Margins

Learn how job costing tracks materials, labor, and overhead by work order, how to calculate job cost accurately, and how scheduling software improves cost control.

April 27, 20269 min read
Assembly line worker organizing component kits in labeled bins on a manufacturing shop floor
Supply Chain

Kitting in Manufacturing: What It Is, How It Works, and Why It Matters

Learn what kitting in manufacturing means, how kitting differs from picking, and how a kitting process improves production scheduling and throughput.

April 27, 20269 min read
Workers reviewing production schedules on a job shop floor with diverse parts in progress
Lean Manufacturing

Can You Do Lean Manufacturing in a Job Shop? Yes - Here's How to Adapt It

Lean manufacturing works in job shops - with the right adaptations. Learn which principles transfer directly and which need modification for high-mix, low-volume production.

April 27, 202612 min read
Kanban board with sticky notes representing lean pull scheduling integrated with MRP planning
MRP

Lean-MRP Hybrid: How to Combine Pull Scheduling with MRP for Long-Lead Materials

Lean and MRP appear to conflict - but most lean shops still need MRP for long-lead purchased materials. Here's how to combine pull scheduling and MRP at the right decoupling points.

April 27, 202612 min read
Factory production line with yellow components being assembled representing production strategy decisions
Production Scheduling

Make-to-Stock vs Make-to-Order vs Assemble-to-Order: Production Strategies and Scheduling Requirements

Full comparison of MTS, MTO, and ATO production strategies - what each means, when to use which, and how scheduling requirements differ across all three approaches.

April 27, 202611 min read
Factory floor with overhead cost allocation visible on a scheduling board showing machine hours and labor distribution
Manufacturing KPIs

Manufacturing Overhead: Allocation Methods, Cost Drivers, and Scheduling Impact

Learn how manufacturing overhead is classified, allocated, and controlled. Discover how scheduling software reduces overhead absorption variances and improves product costing.

April 27, 20269 min read
Manufacturing technician reviewing a standard operating procedure binder at a production workstation
Lean Manufacturing

Manufacturing SOPs: How to Write, Implement, and Maintain Standard Operating Procedures

Learn how to create effective manufacturing SOPs that reduce defects, improve training time, and connect to production scheduling for consistent throughput.

April 27, 20269 min read
Industrial workers in safety gear discussing production plans inside a steel manufacturing facility
Production Scheduling

Manufacturing Workforce Management: Shift Planning, Skill Coverage, and Connecting People to Machines

How to plan, schedule, and optimize manufacturing workforce capacity - shift planning, skill matrix management, and integrating labor with machine scheduling.

April 27, 20269 min read
Factory production line assembling customized components for varied product configurations
Production Scheduling

Mass Customization in Manufacturing: 4 Types and How Scheduling Software Makes It Work

Learn the 4 types of mass customization, how it differs from configure-to-order, and how production scheduling software keeps custom manufacturing efficient.

April 27, 20269 min read
Industrial warehouse with steel coils and raw materials storage representing supply chain management
Job Shop Scheduling

Material Shortage Rescheduling: How to Respond When Raw Materials Arrive Late

When materials don't arrive on time, your schedule breaks. Learn the job-shop playbook for material-constrained scheduling, real-time rescheduling, and supplier communication.

April 27, 202611 min read
Let's Solve Your Challenges Together