Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC Platform
EDGEBIC Platform

The Feature Interactions That Surprise People

Scheduling feature conflicts manufacturing planners hit in EDGEBIC: fourteen documented interactions across overlap, changeovers, pools, direction, operators.

July 25, 202610 min read
Outcomes & ROI
Outcomes & ROI

Building the Business Case for Scheduling Software

A business case for production scheduling software your CFO will accept: the four numbers to measure, the costs to include, and the claims to leave out.

July 25, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Overlapping Operations When Changeovers Are Sequence-Dependent

The lot streaming setup time interaction in EDGEBIC: piece-count overlap uses the resolved changeover, so resequencing a machine moves every downstream start.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

When Machine Pools Meet Parallel Operations

Parallel work centers machine pools resolve in order in EDGEBIC: the pool picks one machine first, then parallel partners attach. What composes, what conflicts.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Bottleneck Scheduling and Due-Date Scheduling in the Same Plan

TOC backward scheduling precedence in EDGEBIC: two different backward passes, opposite triggers, and what happens when one job qualifies for both.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Scheduling Ovens, Baths and Other Continuous-Process Equipment

Continuous process work center scheduling in EDGEBIC: the flag that switches overlap from piece counts to an hour lag, and which equipment truly qualifies.

July 25, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Microsoft Dynamics Scheduling Gaps (And How EDGEBIC Fills Them)

Dynamics finite capacity scheduling gaps plants report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, slow what-if answers.

July 25, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Microsoft Dynamics to EDGEBIC: The Data Mapping Reference

Dynamics data export scheduling field by field: map items, work centers, routings, orders and hours into EDGEBIC masks, with conversions and upsert rules.

July 25, 202612 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + Microsoft Dynamics Integration FAQ: 12 Questions Plants Ask First

Answers to the Dynamics scheduling integration questions plants ask first: exports, connectors, editions, platform updates, and how dates get back.

July 25, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + Microsoft Dynamics: The Complete Scheduling Integration Guide

Dynamics production scheduling integration with EDGEBIC: export items, work centers, routings and orders, map columns once, schedule at finite capacity.

July 25, 202611 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Certified Operators in Aerospace Manufacturing

Aerospace operator certification scheduling: the schedule stops booking five Inconel jobs against one certified welder and starts showing the real slip.

July 25, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Traceable Routings for Aerospace and Defense Work

Aerospace routing traceability scheduling: every job keeps the exact routing it was scheduled with, so an engineering change cannot silently re-route live work.

July 25, 20269 min read
Let's Solve Your Challenges Together