Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
The Feature Interactions That Surprise People
Scheduling feature conflicts manufacturing planners hit in EDGEBIC: fourteen documented interactions across overlap, changeovers, pools, direction, operators.
Building the Business Case for Scheduling Software
A business case for production scheduling software your CFO will accept: the four numbers to measure, the costs to include, and the claims to leave out.
Overlapping Operations When Changeovers Are Sequence-Dependent
The lot streaming setup time interaction in EDGEBIC: piece-count overlap uses the resolved changeover, so resequencing a machine moves every downstream start.
When Machine Pools Meet Parallel Operations
Parallel work centers machine pools resolve in order in EDGEBIC: the pool picks one machine first, then parallel partners attach. What composes, what conflicts.
Bottleneck Scheduling and Due-Date Scheduling in the Same Plan
TOC backward scheduling precedence in EDGEBIC: two different backward passes, opposite triggers, and what happens when one job qualifies for both.
Scheduling Ovens, Baths and Other Continuous-Process Equipment
Continuous process work center scheduling in EDGEBIC: the flag that switches overlap from piece counts to an hour lag, and which equipment truly qualifies.
Microsoft Dynamics Scheduling Gaps (And How EDGEBIC Fills Them)
Dynamics finite capacity scheduling gaps plants report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, slow what-if answers.
Microsoft Dynamics to EDGEBIC: The Data Mapping Reference
Dynamics data export scheduling field by field: map items, work centers, routings, orders and hours into EDGEBIC masks, with conversions and upsert rules.
EDGEBIC + Microsoft Dynamics Integration FAQ: 12 Questions Plants Ask First
Answers to the Dynamics scheduling integration questions plants ask first: exports, connectors, editions, platform updates, and how dates get back.
EDGEBIC + Microsoft Dynamics: The Complete Scheduling Integration Guide
Dynamics production scheduling integration with EDGEBIC: export items, work centers, routings and orders, map columns once, schedule at finite capacity.
Scheduling Certified Operators in Aerospace Manufacturing
Aerospace operator certification scheduling: the schedule stops booking five Inconel jobs against one certified welder and starts showing the real slip.
Traceable Routings for Aerospace and Defense Work
Aerospace routing traceability scheduling: every job keeps the exact routing it was scheduled with, so an engineering change cannot silently re-route live work.