Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Scheduling Concepts
Scheduling Concepts

How Mathematical Optimization Improves a Schedule

How EDGEBIC searches for a better job order: a multi-run heuristic layer guaranteed never worse than the baseline, and a CP-SAT solver that reports a proven optimality gap.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Multi-Shift Allocation Fills Capacity

How EDGEBIC spreads one operation across shifts, days, and machine instances: the per-shift capacity bucket, the priority search, and the three ways it splits work.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Operator Skills Constrain a Schedule

How EDGEBIC adds people as a second finite resource: a per-operator hours ledger that stops one certified welder from being scheduled on five machines at once.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Sequence-Dependent Setup Shapes a Schedule

How EDGEBIC uses a per-machine setup matrix to price changeovers by what ran before, turning a deceptive plan into an honest one and an honest one into an efficient one.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Transit Time Between Plants Affects a Schedule

How EDGEBIC models the days a job spends leaving the building: calendar-day versus working-day transit, and how it composes with queue time and lot streaming.

July 29, 20267 min read
Scheduling Concepts
Scheduling Concepts

Load Balancing vs Dedicated Instance Scheduling

Load balancing vs dedicated instance scheduling: how a finite capacity engine splits work across machines, when one job per instance wins, and worked numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Piece Count vs Time Lag Lot Streaming: Which to Use

Piece count vs time lag lot streaming: when to overlap operations by transfer batch pieces, when a start-to-start hour lag fits, and worked numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Push vs Pull Scheduling in a Finite Capacity System

Push vs pull scheduling in a finite capacity system: forward start-as-soon-as-possible against backward JIT right-alignment, the trade-off, and worked dates.

July 29, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bill of Routing (BOR)? Definition and Example

A bill of routing lists the manufacturing steps, work center, and time for each operation to make a product. Definition, a worked example, and how EDGEBIC uses it.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bottleneck Utilization Metric? EDGEBIC Definition

A bottleneck utilization metric measures the load on the constraint machine. See how EDGEBIC computes today and seven-day load on the flagged bottleneck.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Capacity Override in Scheduling?

A capacity override replaces a work center's calculated capacity for a specific day or range. Definition, the priority order, and how EDGEBIC applies it to the plan.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Column Glossary in Reporting? EDGEBIC Definition

A column glossary is built-in documentation for every report column: its definition, formula, unit, and examples. See how EDGEBIC's Column Details makes reports self-explaining.

July 29, 20266 min read
Let's Solve Your Challenges Together