Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Scheduling Concepts
Scheduling Concepts

Anchor Scheduling vs Plain Backward Scheduling

Anchor scheduling vs plain backward scheduling: pinning a bottleneck to a target date against right-aligning a whole order to its due date, with worked dates.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Campaign Sequencing to Minimize Changeovers

Campaign sequencing to minimize changeovers: how sequence-dependent setup works, why grouping like with like frees capacity, and worked paint booth numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Dependent vs Independent Parallel: When to Use Each

Dependent vs independent parallel work centers: when machines split the work to finish faster, when they must run in lockstep, and worked scheduling numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Hours-Based vs Piece-Based Capacity Modeling

Hours-based vs piece-based capacity modeling: when to size a work center by time, when by output rate, when by both, and worked capacity numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Frozen Routing Snapshot Protects a Running Job

Why EDGEBIC saves an exact copy of the routing each job was scheduled with, so a mid-order engineering change never silently re-routes an operator's remaining steps.

July 29, 20267 min read
Scheduling Concepts
Scheduling Concepts

How a Quote Simulation Produces a Realistic Date

Why an EDGEBIC quote date holds up: the simulation borrows the live scheduling engine, runs against real capacity in memory, writes nothing, and reports the same date the real run gives.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Schedule Accounts for Holidays and Downtime

How EDGEBIC turns shifts, three levels of holidays, downtime windows, and capacity overrides into the effective hours a work center has on any given day.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Decides Which Job Runs First

How a scheduler decides which job runs first: the priority, start date, due date sort, deterministic tie-breaking, and how dispatch rules fit in, with worked numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Nets Demand Against Inventory

How EDGEBIC checks on-hand stock before it schedules a build: the append-only ledger, consume-from-stock netting, and how it avoids double-allocating the same units.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Preserves Completed Work

Why a reschedule in EDGEBIC never moves finished operations: the three-zone model that freezes completed work, forward-shifts partial work, and re-plans only what has not started.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Recovers From a Mid-Shift Disruption

How a scheduler recovers from a mid-shift disruption: the three zones of a reschedule, why completed work never moves, and worked reschedule numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Finite Capacity Scheduling Handles a Shared Bottleneck

How finite capacity scheduling handles a shared bottleneck: why the constraint runs one job at a time, how load factor finds it, and how jobs queue, with numbers.

July 29, 20268 min read
Let's Solve Your Challenges Together