Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC How-To
EDGEBIC How-To

How to Set Partial-Confirm Behavior in EDGEBIC

Decide what EDGEBIC does with a short confirm: trust the operator's Actual End or forward-shift the missing hours, set in the Schedule policy tab.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set Pieces Required on a Routing Step in EDGEBIC

Schedule a routing step by piece count in EDGEBIC. Set the step's Unit Type to pieces and enter the pieces requirement, backed by a pieces-based work center rate.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set the Applicable Instance Count on a Step in EDGEBIC

Cap how many of a work center's machine instances a routing step may use in EDGEBIC. Set Applicable Instances in the step's Properties, distinct from the work center's total instances.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set the Capacity Search Window in EDGEBIC

Control how far the EDGEBIC scheduler looks ahead for free capacity: set the Search ahead days in the Capacity Search Window, from 30 days upward.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set the Optimizer Time Budget in EDGEBIC

Choose how long the EDGEBIC optimizer thinks: set the Time budget per run, 10, 30, or 60 seconds, on the Optimizer tab before you run and Accept.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set the Order Jobs Are Scheduled In in EDGEBIC

Control the sequence EDGEBIC plans jobs in: set priority, understand the start-date and due-date tie-breakers, and see why queue order is the plan on a loaded machine.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set Up a Shop Floor Kiosk in EDGEBIC

Set up a shop floor kiosk in EDGEBIC: install the terminal, point it at the shared database, bind it to one work center and instance, and start punching.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Set Work Center Efficiency in EDGEBIC

How to reflect a machine's realistic productive rate in EDGEBIC: the utilization multiplier behind the capacity formula, honest shift hours, capacity overrides, and where piece rates really live.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Show Setup and Queue Time on the Gantt in EDGEBIC

Render setup and queue time as their own segments on EDGEBIC bars: use the Setup and Queue Time card on the Configuration Manufacturing tab, then apply.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Simulate a Schedule Without Committing It in EDGEBIC

See a plan's dates, hours, and cost in EDGEBIC without touching the live schedule: run a what-if scenario simulation, or let the optimizer propose a plan you accept or discard.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Switch from SQLite to SQL Server in EDGEBIC

Switch EDGEBIC from the local SQLite file to a shared SQL Server database: back up first, change the provider, and understand what does not migrate.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Use the Operator Dispatch Board in EDGEBIC

Use the operator dispatch board in EDGEBIC: open the Dispatch tab under Daily Hours to read a per-operator daily work list grouped by person and date, filtered to a window.

July 28, 20266 min read
Let's Solve Your Challenges Together