Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
The EDGEBIC Control Tower: A Roadmap Vision, Not Yet Built
The EDGEBIC Control Tower is a documented roadmap vision, not a shipped feature. Here is what it would show, and the real capabilities that exist in EDGEBIC today.
The EDGEBIC Data Snapshot: A Faster Path to Support Answers
How the EDGEBIC data snapshot pulls your job records and runs integrity checks so support can answer why does my schedule look wrong in minutes, not days.
SQLite or SQL Server: EDGEBIC Database Options for IT Buyers
EDGEBIC database options for IT: when to run the local SQLite database versus shared SQL Server, how the two scale, and how to move between them without a rewrite.
EDGEBIC for 3D Printing: Scheduling Printer Pools and Long Builds
Additive manufacturing scheduling in EDGEBIC: work center groups pool identical printers, and multi-shift capacity plans the long unattended builds that run overnight.
EDGEBIC for Cosmetics: Batch Scheduling and Changeovers
Cosmetics and personal care batch scheduling in EDGEBIC: sequence fragrance, color, and allergen changeovers to cut sanitation time and keep compounding lines running.
EDGEBIC for Industrial Equipment: Make-to-Order Scheduling
Make-to-order scheduling for industrial equipment in EDGEBIC: backward-schedule from the due date, coordinate multi-level sub-assemblies, and quote honest promise dates.
EDGEBIC for Rubber and Elastomer: Compound Changeovers
Rubber and elastomer production scheduling in EDGEBIC: price compound and color changeovers in a setup matrix and model curing ovens as continuous-process work centers.
EDGEBIC for Semiconductor Scheduling: Recipe Changeovers
Semiconductor production scheduling in EDGEBIC: a sequence-dependent setup matrix prices every recipe changeover on shared tools so lot sequence stops burning capacity.
EDGEBIC for Sheet Metal: Scheduling Around Your Nests
Sheet metal fabrication scheduling in EDGEBIC: sequence nested cut jobs by material and gauge, route across laser and punch machines, and plan the brake bottleneck.
Inside EDGEBIC's Self-Documenting Reports: A Deep Dive
How EDGEBIC's report glossary works under the hood: structured column definitions with formulas, examples, and linked terms that serve both planners and AI agents.
From Sales Order to MPS to Schedule in EDGEBIC
Follow one customer order through EDGEBIC end to end: confirmed sales line to firm demand, MPS commit and firm, build-to-stock order, and finite-capacity schedule.
Greater-Of vs Minus-Consumed: Forecast Consumption Rules in EDGEBIC
How EDGEBIC's two forecast consumption rules stop firm orders and forecasts double-counting the same demand, with worked numbers for choosing between them.
