Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Outcomes & ROI
Outcomes & ROI

The Labor Constraint You Are Not Scheduling

Operator skill scheduling closes the gap machine-only plans miss: how modeling certified people as a finite resource stops the silent slip of promising one welder to five jobs.

August 4, 20268 min read
Schedule Optimization
Schedule Optimization

The Never-Worse Guarantee in Schedule Optimization

The EDGEBIC multi-run optimizer is guaranteed never worse than your baseline. Here is how a post-solve clamp enforces that promise instead of just hoping for it.

August 4, 20267 min read
Shop Floor Execution
Shop Floor Execution

The Operator Attend Fraction Explained in EDGEBIC

Not every machine needs a person for its whole run. The attend fraction sets how much operator time a run consumes, from setup-only to lights-out to a two-person crew.

August 4, 20268 min read
Troubleshooting
Troubleshooting

The Optimizer Refused My Proposal as Stale: Causes and Fixes

When Accept on an optimizer proposal is refused as stale, the schedule changed under the proposal. Why the guard exists and how to get a fresh, acceptable plan.

August 4, 20266 min read
Shop Floor Execution
Shop Floor Execution

The Prior-Step Actuals Gate at the Kiosk in EDGEBIC

Start a downstream operation before earlier steps are logged and EDGEBIC warns you. Learn what the prior-workcenter prompt does, the honest path, and what the backfill costs.

August 4, 20267 min read
Schedule Optimization
Schedule Optimization

The Safety Gate Every Optimized Schedule Must Pass

Before any optimized plan reaches you, EDGEBIC runs it through a validity gate. Here is what the safety gate checks and why a solver's proposal is never trusted blindly.

August 4, 20267 min read
Schedule Optimization
Schedule Optimization

The Total Assigned Hours Metric in Optimization

Total assigned hours is the workload a schedule commits across every operation. Here is how the EDGEBIC optimizer reports it and why it usually holds steady when you reorder.

August 4, 20267 min read
Schedule Optimization
Schedule Optimization

The Working-Hour Timeline in Schedule Optimization

How the CP-SAT solver in EDGEBIC measures time: 36-second ticks on a compressed working-hour axis, with nights, weekends, and holidays squeezed out before it solves.

August 4, 20268 min read
Schedule Optimization
Schedule Optimization

Weighted Versus Total Tardiness in Optimization

The EDGEBIC optimizer tracks two lateness measures. Total tardiness sums all late hours; weighted tardiness scales each job by priority so a critical job late counts for more.

August 4, 20268 min read
Scheduling Concepts
Scheduling Concepts

What Each Scheduling Mode Rebuilds

The five EDGEBIC scheduling modes decide which orders a run touches and which existing capacity it keeps: new-only, full reschedule, all unstarted, smart incremental, and single-job, with worked outcomes.

August 4, 20268 min read
Schedule Optimization
Schedule Optimization

What Happens When You Discard an Optimized Schedule

Discarding an optimizer proposal leaves your committed schedule byte-for-byte unchanged. Here is exactly what happens when you decline a plan in EDGEBIC.

August 4, 20267 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bill of Materials (BOM) in Manufacturing?

A bill of materials is the complete list of components needed to make one unit of a product. Here is what a BOM is and how it relates to routing.

August 4, 20266 min read
Let's Solve Your Challenges Together