Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
Scheduling Conveyor and Material Handling Equipment by Ship Set
Conveyor manufacturing scheduling that holds a ship set together, overlaps fabrication with transfer batches, and works backward from each installation start date.
Scheduling Dental Labs by Case Due Date
Dental lab scheduling that works backward from each case ship date, routes work to certified technicians, and holds thousands of one-off cases to promised days.
Scheduling Electrical Enclosure Fabrication From Punch to Wire-Out
Electrical enclosure scheduling that overlaps punch and brake with weld, batches powder coat by color, and times wire-out sub-assemblies to the final build date.
Scheduling Gear Manufacturing Across Hobbing, Heat Treat, and Grinding
Gear manufacturing scheduling that groups hob setups by cutter family, carries heat treat transit as real time, and pools grinders so jobs flow to the free machine.
Scheduling HVAC Equipment Manufacturing Through the Season
HVAC manufacturing scheduling that plans build-ahead stock against a seasonal curve, adds shifts where the coil line binds, and holds custom air handler dates.
Scheduling Optical and Lens Manufacturing Around Coating Chambers
Optical manufacturing scheduling that batches coating chambers one run per day, pools interchangeable polishers, and works backward from each prescription ship date.
Scheduling Pump and Valve Assembly With Sub-Assembly Feeds
Pump and valve assembly scheduling that times sub-assembly feeds to the final build, pools test stands, and holds hydrostatic test capacity to the promised ship date.
Scheduling Screw Machine and Swiss Turning Shops
Screw machine scheduling that pools interchangeable spindles, sequences collet and bar changeovers, and runs Swiss cells unattended across shifts and weekends.
Scheduling Tank and Pressure Vessel Fabrication Around Certified Welders
Pressure vessel scheduling that routes weld steps to certified welders, carries stress relief and radiography hold points, and holds long single-piece jobs to date.
Scheduling Transformer and Coil Winding Around the Impregnation Cycle
Transformer manufacturing scheduling that pools winding machines, treats vacuum impregnation as one load per day, and times core and coil feeds to the tank build.
Scheduling Wire Harness Assembly With Overlapping Operations
Wire harness scheduling that overlaps cut and crimp with board assembly using transfer batches, routes crimp work to certified operators, and holds build dates.
EDGEBIC + Rootstock: The Scheduling Integration Guide
Rootstock production scheduling integration with EDGEBIC: export items, work centers, routings and work orders as CSV, map columns once, then schedule at finite capacity.
