Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Visual Scheduling
Visual Scheduling

Dropping an Operation Back on Its Own Machine in EDGEBIC

On the Planner board, dropping an operation on the machine it already runs on is read as a re-time, never as a second assignment. And a drop with no time change stages nothing at all.

August 18, 20266 min read
Troubleshooting
Troubleshooting

An Operation Moved and the Machine Was Free: Finding the Hidden Cause

A job slid and every machine shows open hours. Tooling is the cause the Gantt cannot draw. How to rule it in or out in two minutes before you chase calendars.

August 18, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Assign an Operation to a Machine in the EDGEBIC Planner View

Drag an operation out of its job lane and drop it on the machine you want it to run on. The machine change and the time change stage together as one edit.

August 18, 20265 min read
EDGEBIC How-To
EDGEBIC How-To

How to Correct an Over-Reported Production Quantity in EDGEBIC

There is no un-report button. Correct an over-reported quantity with a compensating adjustment, or reopen the order to reverse every entry pegged to it.

August 18, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Model a Step That Needs Two Tools in EDGEBIC

A routing step takes one tool. Model a fixture-plus-gauge operation as a single combined tool record, quantity set by whichever you own fewest of.

August 18, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Report a Sub-Assembly as Received in EDGEBIC

Tell EDGEBIC that finished components are on the shelf so the next reschedule explodes only the shortfall of that branch into work center steps.

August 18, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Report Produced Quantity on a Job in EDGEBIC

Tell EDGEBIC that part of a job is already made so the next reschedule plans only the remainder, without editing the order quantity.

August 18, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Require a Tool on a Routing Step in EDGEBIC

Require a tool on a routing step in EDGEBIC: set Required tool: in the BOR grid's Basic Information section, or Required Tool on the node in the BOR Designer.

August 18, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Retire a Tool Without Breaking Routings in EDGEBIC

Deleting a tool that routing steps still require is blocked. Clear the requirement from those steps first, then deactivate, so history survives and no job fails.

August 18, 20266 min read
Scheduling Concepts
Scheduling Concepts

Why a Missing Tool Stops the Job Instead of Scheduling Anyway

A step whose tool is inactive, unknown, or at zero quantity fails the run immediately and names the tool. Why that refusal is a feature, not a limitation.

August 18, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why a Tool Is Held for Setup and Run Alike

An operator can tend two machines at once. A fixture cannot be half mounted. Why tools book at the full rate for every hour, with no attention fraction and no escape.

August 18, 20268 min read
Visual Scheduling
Visual Scheduling

Why an Operation Appears Twice in the EDGEBIC Planner View

On the Planner board every operation draws on its job lane and on its machine lane. It is one operation drawn twice, not a duplicate, and the two bars always move together.

August 17, 20267 min read
Let's Solve Your Challenges Together