Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Troubleshooting
Troubleshooting

A Quote Will Not Convert to an Order: Causes and Fixes

Conversion runs three guards before it creates a job: an already-converted status, an existing linked job, and a job number collision. How to tell which one stopped you.

August 8, 20266 min read
Troubleshooting
Troubleshooting

A Report Shows No Rows for a Date Range That Has Jobs: Causes and Fixes

An empty report over a window that clearly has jobs usually means the report reads actuals, not the plan. How to tell which source a report uses and get rows back.

August 8, 20266 min read
Troubleshooting
Troubleshooting

A Tab I Expect Is Missing: Causes and Fixes

When a module tab you expect is not on screen, the cause is almost always a permission code your roles do not grant. How to find the missing code and restore the tab.

August 8, 20266 min read
Troubleshooting
Troubleshooting

A User Cannot Sign In: Causes and Fixes

When sign-in fails with invalid username or password, the real cause is a bad password, a deactivated account, or a lockout after five failed attempts. The Users grid tells you which.

August 8, 20266 min read
Worked Examples
Worked Examples

Adding a Second Operator to Break a Labor Constraint, Start to Finish

A labor constraint walkthrough in EDGEBIC: diagnose why weld jobs slide while machines sit free, certify a second operator, then watch the constraint move.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Choosing the Right Schedule View in EDGEBIC

EDGEBIC has several production schedule views, and each answers a different question. A guide to picking the right surface for the plant, one machine, one job, or load.

August 8, 20267 min read
Worked Examples
Worked Examples

Closing Out a Finished Job: From the Last Punch to the Variance Review

A job closeout walkthrough in EDGEBIC: verify every step, stamp the actual end, mark the job complete, then read hour variance and CPI before the next quote.

August 8, 20269 min read
Worked Examples
Worked Examples

An Operator Calls In Sick: Covering a Certified Job the Same Morning

A sick operator walkthrough in EDGEBIC: record the absence, reschedule, see which steps re-staff and which slide, and audit the pins that cost a due date.

August 8, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

EDGEBIC Clear Data Tables Explained: The Reset Button With No Undo

How the EDGEBIC Clear Data Tables utility works: scoped clears versus a full wipe, what cascades, what survives, the typed confirmation, and the backup step first.

August 8, 20267 min read
EDGEBIC Platform
EDGEBIC Platform

EDGEBIC Costing and Rates Explained: Four Numbers Behind Every Quoted Price

How EDGEBIC builds a job cost: work center rates, per-step rate overrides, material from product cost, the manual override, and the markup that produces a unit price.

August 8, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

EDGEBIC Database Recovery Explained: What Happens When It Cannot Start

How the EDGEBIC database recovery window works: the four options it offers, what Repair database actually repairs, and why a failed connection is rarely a data problem.

August 8, 20267 min read
EDGEBIC Platform
EDGEBIC Platform

EDGEBIC Downtime Explained: The Hours a Working Day Loses

How EDGEBIC subtracts lost hours from inside a shift, why downtime is not a holiday, and which screens you actually use today to model a maintenance or meeting window.

August 8, 20267 min read
Let's Solve Your Challenges Together