Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Logging History Event Type?

A logging history event type labels each entry in an operation's actuals history: operator start, pause, resume, complete, supervisor edit, or system rollup.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Parallel Work Center Type?

A parallel work center type is the per-entry setting deciding how one extra machine behaves on a routing step: independent, dependent, sequential, or parallel.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Product Id? EDGEBIC Master Data Definition

A product id is the short identifier planners read on every grid and Gantt bar, distinct from the descriptive product name. See why the two fields exist and how renaming works.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Security Role in Manufacturing Software? EDGEBIC Definition

A role is a named bundle of permissions assigned to users. See how EDGEBIC unions roles, why rights are additive only, and what happens to roles after an upgrade.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Short-Confirm Flag on a Routing Step?

A short-confirm flag is a per-step opt-in that forces unlogged hours to be rescheduled when a job is closed short. Learn how it works with site confirm policy.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Stale Capacity Reservation in Scheduling?

A stale capacity reservation is a machine booking left by an earlier run for work that never started. Learn why a reschedule must release it before re-planning.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Synthetic Shift Slot in Capacity Scheduling?

A synthetic shift slot is the placeholder shift the scheduler creates when a capacity override lands on a day with no regular shift. Learn how weekend overrides work.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Actual Cost in Earned Value Reporting? EDGEBIC Definition

Actual cost is the hours truly logged against a job by the cut-off date. See how EDGEBIC measures it in hours first, values it in currency second, and uses it for CPI.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is an Inferred Completion in Rescheduling?

An inferred completion is a step the scheduler concludes must have run because a later step was logged. Learn how backfilled actuals keep a reschedule honest.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Days Late on a Job? EDGEBIC Definition and Formula

Days late is the gap between a job's last scheduled operation end and its due date. See the formula, why only positive values appear, and how the signed version differs.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Estimated Lead Time on a Quote? EDGEBIC Definition

Estimated lead time is the calendar gap between a quote simulation's start and end. See why it dwarfs the work hours and how it differs from a product's lead time.

August 10, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Moving Average Cost? EDGEBIC Inventory Definition

Moving average cost is one blended unit cost recomputed on every receipt. See the weighted-average formula, why issues never change it, and how it is stamped on the ledger.

August 10, 20266 min read