Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
Everything we have published.
Self-Explaining Reports: Every EDGEBIC Column Defines Itself
Self documenting reports in manufacturing software: how every EDGEBIC report column carries its own definition, formula, unit and examples, one click away.
The EDGEBIC Setup Matrix: Sequence-Dependent Changeover, Explained
Sequence dependent setup matrix software explained: how families, matrix cells, and product overrides replace a flat setup number with the real changeover time.
Shifts, Holidays, and Calendars in EDGEBIC: The Plant Clock
A production shift calendar drives every scheduling promise date. How shifts, holidays, downtime, and capacity overrides layer into available hours in EDGEBIC.
TOC Anchor Scheduling in EDGEBIC, Explained
How theory of constraints scheduling software works: EDGEBIC pins the constraint operation to a date, then plans upstream backward and downstream forward.
EDGEBIC Users and Roles Explained: Who Can Change the Schedule
Manufacturing software user roles decide who can reschedule, log actuals, or wipe data. Here is how EDGEBIC's permission model works and how to shape it.
What-If Scenarios in EDGEBIC: Testing the Answer Before You Give It
What if analysis in production scheduling, applied: how EDGEBIC scenarios test a second shift, a vendor step, or a weekend push without touching the plan.
Work Center Groups in EDGEBIC: Machine Pools for Planners
Machine pool scheduling software in EDGEBIC: how work center groups differ from alternates, instances, and departments, and which one your shop should use.
Work Centers in EDGEBIC: What They Are and What Every Setting Does
Work center setup in scheduling software decides every promise date. What a work center is in EDGEBIC, and what instances, capacity type, and the flags change.
End Item Lead Time: Item Start vs Job End in EDGEBIC
End item lead time splits every job's finish into two dates. See how Item Start and Job End work, why lateness is judged at Job End, and how backward reserves it.
Epicor to EDGEBIC: The Data Mapping Reference
Epicor data export scheduling field by field: map parts, resources, methods of manufacture, and jobs into EDGEBIC import masks, with conversions and outcomes.
Firm Demand, Forecast, and Time Fences: Inside the EDGEBIC MPS
How time fences work in the EDGEBIC master production schedule: where firm demand comes from, how forecast consumption nets, and what each fence actually suppresses.
8 Demand Forecasting Mistakes That Distort a Manufacturing Replenishment Plan
Demand forecasting mistakes in manufacturing usually come from data entry, not statistics. Here are eight that distort replenishment, and their symptoms.
